Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD00-03451
StatusFinaled
Name FRANKLIN BUILDING SUPPLY (WAREHOUSE)
Site Address 200 N CLOVERDALE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Remodeling for a new tenant in an existing 38,711 sq. ft. building for warehouse/storage use (S-1 Occupancy), area for Door Shop (F-1 Occupancy), accessory offices (B Occupancy), and an accessory assembly lunch/break room (A-3 Occupancy) per approved plans on file. This building was originally constructed in Ada County and later annexed into Boise City. Work to include upgrading restrooms to meet current accessibility standards, other accessible upgrades include doors and all door hardware, new exterior canopy and loading dock, new footings to support existing roof beams, other footings, new exterior door, some windows being replaced with tempered glass where required, interior finish, new handrails on existing interior stairway, new guardrails for interior stairway and at sides of new exterior loading dock, new fire sprinklers to meet allowable area, new alarm system, mechanical work, plumbing work, and electrical work. NOTE: This building is to be fully fire sprinklered for area increase. (P.C.#978-00) CZC00-00092. JCB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/14/20018/15/20018/15/2001APART
DetailsTom Arcoraci
JUDE ###-#### -FN ok for perm occ when code enfor signs 8/14/2001 8:55:32 PM
Permanent Occupancy 8/15/20018/15/2001 DONE
Details
BLD-Final8/13/20018/13/20018/13/2001AFAIL
DetailsRuss Owen
###-#### wayne --- frameing inspection.posted c/n on site. 8/13/2001 11:57:07 AM
FIRE-Final Inspection8/13/20018/13/20018/13/2001APASS
DetailsJoe Tawney
Reinsp OK for permanant occupancy 8/13/2001 1:22:11 PM
FIRE-Final Inspection7/6/20017/9/20017/9/2001PFAIL
DetailsJoe Tawney
###-#### Final Fail C/N issued 7/9/2001 4:15:07 PM
BLD-Aging Inspection5/30/20015/30/20015/30/2001 PART
DetailsRuss Owen
expires 8/15/01. 12/30/2001 10:17:03 AM
BLD-Foundation3/19/20013/19/20013/19/2001PPART
DetailsRuss Owen
wants to pour at 3:00 \\###-####dock walls ok. 3/19/2001 4:29:39 PM
BLD-Footing3/14/20013/15/20013/15/2001APASS
DetailsRuss Owen
###-#### footing for loading dock 3/15/2001 1:19:17 PM
BLD-Framing/Rough-in3/13/20013/14/20013/14/2001AFAIL
DetailsRuss Owen
###-#### please call him on your way out. ok to cover east office,west side has rest room which does not comply with size dem on plans. 3/14/2001 1:27:01 PM
BLD-Footing2/16/20012/20/20012/20/2001APART
DetailsRuss Owen
interior footing inspection wayne ###-####need clairification from architect. 2/20/2001 1:56:46 PM