BLD-Final | 9/5/2001 | 9/5/2001 | 9/5/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/05/2001 at 08:52:00. Contact: .ok pemanent oc. 9/5/2001 2:08:01 PM
|
Permanent Occupancy | | 9/5/2001 | 9/5/2001 | | DONE |
|
|
|
|
BLD-Final | 8/30/2001 | 8/31/2001 | 8/31/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 12:39:31. Contact: ###-####. left a c/n to fire/caulk over exposed rock wool at roof joist at 1 hour fire wall shop/spray room side only. all othEr items for perm oc have been resolved/signed approved. 8/31/2001 10:10:35 AM
|
BLD-Final | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 07:08:56. Contact: ###-####. 8/16/2001 2:47:48 PM ok for temp occ 8/16/2001 3:59:19 PM
|
BLD-Final | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | PART |
Dave Hannah
|
|
|
per dave fn ok for temp occ still needs mec to sing off perm occ 8/16/2001 3:58:56 PM
|
FIRE-Final Inspection | 8/16/2001 | 8/16/2001 | 8/16/2001 | P | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 8/16/2001 4:01:36 PM
|
BLD-Final | 8/11/2001 | 8/13/2001 | 8/13/2001 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/11/2001 at 11:57:55. Contact: ###-####.
|
FIRE-Final Inspection | 8/11/2001 | 8/13/2001 | 8/13/2001 | P | CANC |
Joe Tawney
|
|
|
Cancel not ready 8/13/2001 9:56:55 AM
|
BLD-Conference | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/08/2001 at 17:13:31. Contact: ###-####. 8/9/2001 12:12:32 PM
|
FIRE-Final Inspection | 8/7/2001 | 8/8/2001 | 8/8/2001 | P | PART |
Joe Tawney
|
|
|
Final Spklr and alarm systems OK. Need to verify interlocks on spray booth and dust collection system. 8/8/2001 5:09:22 PM
|
BLD-Other | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 15:05:39. Contact: ###-####..ok to drop ceiling tile. note at this time the firewall penetrations have not yet been caulked. 8/1/2001 10:43:20 AM
|
BLD-Other | 7/26/2001 | 7/27/2001 | 7/27/2001 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 15:40:32. Contact: ###-####.c/n posted. 7/27/2001 10:49:43 AM
|
FIRE-Conference | 7/20/2001 | 7/23/2001 | 7/23/2001 | P | PASS |
Joe Tawney
|
|
|
###-#### Conf with contr regarding dust equip interlock and spray booth 7/23/2001 5:21:25 PM
|
BLD-Aging Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 | | PART |
Russ Owen
|
|
|
exp 9/10/01. 1/4/2002 4:00:23 PM
|
BLD-Framing/Rough-in | 4/3/2001 | 4/4/2001 | 4/4/2001 | A | PART |
Russ Owen
|
|
|
steel\\###-####
|
BLD-Footing | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### spec insp wip 3/15/2001 9:23:56 AM
|