Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD00-03516
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 1160 E EXCHANGE ST
Project NamePCS3302
Customer NumberPCS3302
ePlanReviewNo
Description
Micron (PCS3302) Exchange Street Warehouse * To modify existing warehouse building to accommodate equipment assembly area, high-piled storage and additional office area. To construct a new 2,952 sq.ft. mezzanine for office use within the existing building and to construct a 3,060 sq.ft., one story loading dock addition per approved plans and attachmenets, DRH97-00095, DRH95-00148 and DRH00-00207 PC#1015 This building is fully fire sprinklered for area. Note: At time of review hazardous materials proposed for use and storage did not exceed the maximum allowables in UBC Tables 3-D and 3-E.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/2/20018/3/20018/3/2001APASS
DetailsJim Storey
###-#### final ok. 8/3/2001 10:41:18 AM
Permanent Occupancy 8/3/20018/3/2001 DONE
Details
BLD-Final6/27/20016/29/20016/29/2001APART
DetailsJim Storey
fn jack-- ###-#### pending others. 6/29/2001 11:22:08 AM
FIRE-Final Inspection6/29/20016/29/20016/29/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 6/29/2001 10:34:15 AM
BLD-Final6/7/20016/8/20016/8/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/07/2001 at 09:29:18. Contact: ###-####.temp occ ok for all areas but the high pile s 6/8/2001 5:43:45 PM toage in center of bldg. copy of occ. card siged to be flled down town . 6/8/2001 5:45:20 PM
FIRE-Alarm Testing6/7/20016/8/20016/8/2001AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/07/2001 at 13:54:28. Contact: ###-####. need 60 hr batteries; detectors installed per plans; repair strobe; c/n issued 6/8/2001 2:01:49 PM
FIRE-Final Inspection6/7/20016/8/20016/8/2001AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/07/2001 at 13:49:56. Contact: ###-####. exit signs not working 6/8/2001 2:02:05 PM
BLD-Framing/Rough-in6/5/20016/6/20016/6/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/05/2001 at 13:50:17. Contact: ###-####. ceilling ok for cover. 6/6/2001 3:14:30 PM
BLD-Framing/Rough-in6/1/20016/4/20016/4/2001APART
DetailsJim Storey
###-#### conf for temp occ. fire isues/ all others need final and need racking permit. 6/4/2001 10:39:40 AM
FIRE-Conference6/1/20016/4/20016/4/2001APART
DetailsRick Jackson
###-#### talked with Micron, Jim Storey and GC about sprinkler issues with curtain boards and occupancy requirements 6/4/2001 10:31:05 AM
BLD-Framing/Rough-in5/7/20015/8/20015/8/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/07/2001 at 09:09:13. Contact: ###-####. walls ok for cover and roof deck welding approved. 5/8/2001 3:47:28 PM
BLD-Framing/Rough-in5/3/20015/4/20015/4/2001ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/03/2001 at 13:42:59. Contact: ###-####...need elec & eng's statement for roof deck welds. 5/4/2001 11:40:38 AM
BLD-Framing/Rough-in4/30/20015/1/20015/1/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/30/2001 at 10:52:47. Contact: ###-####.
BLD-Framing/Rough-in4/26/20014/27/20014/27/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/26/2001 at 10:37:03. Contact: ###-####. struc. engn. tim to submit puddle size and perimtor spacing. spoke with tim on phone. 4/27/2001 3:35:54 PM
BLD-Other4/17/20014/18/20014/18/2001AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/17/2001 at 15:41:06. Contact: ###-####. welding conections requier special insp. 4/18/2001 3:43:00 PM
BLD-Concrete4/9/20014/10/20014/10/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/09/2001 at 13:38:10. Contact: ###-####. grout pour ok / no shrink grout ok pour back at mez ok for cover. 4/10/2001 3:27:32 PM
BLD-Footing4/6/20014/9/20014/9/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/06/2001 at 15:40:55. Contact: ###-####. mez. deck and struc ok for placement./dock levelers ok to pour / massonary in fills rebar epoy drill depth ok 4/9/2001 9:16:21 AM
BLD-Footing4/5/20014/6/20014/6/2001ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/05/2001 at 15:58:54. Contact: ###-####. jach called rained out. 4/6/2001 9:15:00 AM
BLD-Footing4/2/20014/3/20014/3/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/02/2001 at 15:24:47. Contact: ###-####. pending special insp. report. 4/3/2001 2:03:05 PM 4/3/2001 4:21:54 PM
BLD-Framing/Rough-in3/29/20013/30/20013/30/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 03/29/2001 at 14:52:04. Contact: ###-####. walls ok for cover f and b occ area. 3/30/2001 9:13:11 AM
BLD-Footing3/28/20013/29/20013/29/2001PPASS
DetailsJim Storey
###-####