BLD-Final | 8/28/2001 | 8/29/2001 | 8/29/2001 | A | PASS |
Steven Webb
|
|
|
###-#### GEORGE
|
BLD-Final | 8/24/2001 | 8/27/2001 | 8/27/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 13:14:52. Contact: ###-####. Not all required signatures completed. 8/27/2001 11:39:42 AM
|
FIRE-Final Inspection | 8/23/2001 | 8/23/2001 | 8/23/2001 | P | PASS |
Rick Jackson
|
|
|
###-#### george
|
FIRE-Final Inspection | 8/21/2001 | 8/21/2001 | 8/21/2001 | P | FAIL |
Rick Jackson
|
|
|
george ###-#### fire fn --will be on site until 3:30 address; exit sign or door hardware in office 8/22/2001 10:43:42 AM
|
BLD-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 | | PART |
Steven Webb
|
|
|
wip 7/16/2001 7:56:44 AM
|
BLD-Framing/Rough-in | 5/11/2001 | 5/14/2001 | 5/14/2001 | A | PASS |
Steven Webb
|
|
|
reinspection George ###-#### Prior c/n items corrected. 5/14/2001 11:08:30 AM
|
BLD-Framing/Rough-in | 5/10/2001 | 5/10/2001 | 5/10/2001 | P | PART |
Steven Webb
|
|
|
George Maxwell ###-#### C/N issued--Shear and frame of office building. 5/10/2001 3:27:27 PM
|
BLD-Concrete | 4/19/2001 | 4/19/2001 | 4/19/2001 | P | PASS |
Steven Webb
|
|
|
###-#### flat work for floor--4" 4/19/2001 2:13:40 PM
|
BLD-Foundation | 4/3/2001 | 4/4/2001 | 4/4/2001 | P | PART |
Steven Webb
|
|
|
###-####wip-rebar set except drive through in south wall-will verify hd's at next inspection. 4/4/2001 2:58:31 PM
|
BLD-Footing | 3/28/2001 | 3/30/2001 | 3/30/2001 | A | PART |
Steven Webb
|
|
|
George ###-####Requested engineering or removal of 4 " electrical condiut at nw corner of building. ok to pour remainer of formed footing. 3/30/2001 11:59:07 AM
|