BLD-Final | 4/6/2001 | 4/9/2001 | 4/9/2001 | A | PASS |
Jim Sly
|
|
|
Matt ###-#### C/C issued. 4/9/2001 11:05:18 AM
|
BLD-Energy code compliance | 2/16/2001 | 2/16/2001 | 2/16/2001 | P | PASS |
Steven Webb
|
|
|
Matt ###-####
|
BLD-Framing/Rough-in | 2/16/2001 | 2/16/2001 | 2/16/2001 | P | PASS |
Steven Webb
|
|
|
reinspection Matt ###-####
|
BLD-Framing/Rough-in | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | PART |
Steven Webb
|
|
|
reinspection Matt ###-####c/n issued--eng. needed on 2 ply ml with hole penetration, gable trusses of m. bed and b.r. # 2 needs stiffbacks or standard gable truss detail indicating not needed, solid bearing under m.l in closet off formal gathering room, marked with black x. 2/15/2001 1:03:01 PM
|
BLD-Framing/Rough-in | 2/13/2001 | 2/14/2001 | 2/14/2001 | P | PASS |
Steven Webb
|
|
|
###-####Shear not framing, ok to side. 2/14/2001 2:17:58 PM
|
BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | CANC |
Steven Webb
|
|
|
###-####: CANCELLED BY CONTRACTOR 2/12/2001 12:46:44 PM
|
BLD-Framing/Rough-in | 2/6/2001 | 2/6/2001 | 2/6/2001 | P | FAIL |
Steven Webb
|
|
|
###-####c/n issued--missing hd's (4) in front. Mispositioned hd's (2 in front), additional nailing required. 2/6/2001 2:19:22 PM
|
BLD-Foundation | 1/4/2001 | 1/5/2001 | 1/5/2001 | A | PART |
Steven Webb
|
|
|
FOUND TODD ###-#### Already pourted, appeared ok. 1/5/2001 11:57:57 AM
|
BLD-Footing | 1/3/2001 | 1/4/2001 | 1/4/2001 | A | NR |
Tony Young
|
|
|
FT INSP- TODD ###-####
|
BLD-Footing | 1/3/2001 | 1/3/2001 | 1/3/2001 | P | PART |
Steven Webb
|
|
|
FT INSP-- TODD ###-#### rebar not totally installed.1/3/2001 3:33:29 PM 1/3/2001 3:33:37 PM 1/3/2001 3:33:51 PM
|