Permit Information
Permit NumberBLD00-03610
StatusFinaled
Name CHEVRON PIPE LINE CO
Site Address 201 N PHILLIPPI ST
Project NameCHEVRON PIPELINE CO.
Customer Number 
ePlanReviewNo
Description
To construct a 240 square foot pre-manufactured metal test lab for Chevron Pipeline. All work per approved plans and attachments, CZC00-00120 MLO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/12/20022/14/20022/14/2002APASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 2/12/2002 5:13:15 PM elec final ok per jack frank 2/13/2002 8:11:19 AM ok for perm occ 2/14/2002 9:34:43 AM
BLD-Framing/Rough-in2/14/20022/14/20022/14/2002APASS
DetailsTom Arcoraci
Added by Inspector: 408 On 2/14/2002 9:34:19 AM
Permanent Occupancy 2/14/20022/14/2002 DONE
Details
FIRE-Final Inspection1/31/20022/1/20022/1/2002APASS
DetailsTroy Cobbley
Fire life/safety finaled 2/1/2002 8:45:29 AM
BLD-Conference1/31/20021/31/20021/31/2002PCANC
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 1/31/2002 1:49:21 PM
FIRE-Final Inspection1/30/20021/31/20021/31/2002AFAIL
DetailsTroy Cobbley
provide correct hardware on door and mount fire extinguisher at 48" above finish floor 1/30/2002 2:20:45 PM
BLD-Aging Inspection1/23/20021/23/20021/23/2002 PART
DetailsTom Arcoraci
talked with dan wip 1/30/2002 11:18:57 AM
BLD-Aging Inspection11/12/200111/12/200111/12/2001 NR
DetailsTom Arcoraci
chev pipe line 11/14/2001 8:14:20 AM
BLD-Aging Inspection9/10/20019/10/20019/10/2001 PART
DetailsTom Arcoraci
BLD-Aging Inspection7/9/20017/9/20017/9/2001 PASS
DetailsTom Arcoraci
BLD-Footing5/9/20015/9/20015/9/2001PPASS
DetailsTom Arcoraci
Dan ###-####