To remodel the tenant in the north end of the building consisting of a 10,000 sq.ft. first floor and 5,000 sq.ft. second floor per approved plans on file. Occupancies to be retail showroom/fabrication wood working shop/office and storage. Work to include, construction of a one-hour occupancy separation between the F1 wood working shop and the offices and retail areas, removal of gaudrail on the second floor and construct one-hour occupancy separation wall, installation of an approved dust removal system, construction of a circular stairway between First and Second floor office spaces, installation of new glazing storefront glazing and door, construction of interior partitions to create additional office spaces on the second floor, Miscelaneous related interior finishes. NOTE: This building is fully fire sprinklered for area increase. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. This building was constructed in Ada County and annexed into Boise City. Original plans for this building (Industrial Resource Center Bldg. #4) and adjacent building (Industrical Resource Center Bldg. #3) are scanned with this plan. (P.C. #1043-00) *RMH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection8/15/20038/15/20038/15/2003 CANC
DetailsRuss Owen
BLD-Aging Inspection1/14/20021/14/20021/14/2002 PART
DetailsRuss Owen
no insp called for . 1/14/2002 10:19:21 AM
BLD-Conference11/13/200111/13/200111/13/2001 DONE
permit extension
BLD-Aging Inspection10/16/200110/16/200110/16/2001 PART
DetailsRuss Owen
2nd phase not started yet. 10/16/2001 10:59:34 AM
BLD-Aging Inspection8/16/20018/16/20018/16/2001 PART
DetailsRuss Owen
2nd faze not yet started. 8/22/2001 1:10:16 PM
BLD-Final6/5/20016/5/20016/5/2001PPART
DetailsRuss Owen
John Taylor ###-#### need to install the new stair case and upper floor offfice area work has not been completed, need penetrations on firewall, caulked and removed 6 in exhaust duct out of firewall. 1/5/2002 4:31:04 PM
FIRE-Final Inspection5/23/20015/30/20015/30/2001APASS
DetailsJoe Tawney
Reinsp Pass on phase II of permit 5/30/2001 8:49:00 AM
BLD-Final5/18/20015/18/20015/18/2001PFAIL
DetailsJoe Tawney
Added by Inspector: 406 On 5/18/2001 2:12:10 PM Reinsp Fail Fire door and batteries in FACP, Knox Box, breaker lock for FACP
BLD-Framing/Rough-in4/23/20014/23/20014/23/2001PPART
DetailsRuss Owen
tom ###-#### ok to sheetrock lower floor walls only ,upper floor not done.also ceiling not done. 11/23/2001 3:49:21 PM
FIRE-Final Inspection2/28/20013/1/20013/1/2001AFAIL
DetailsJoe Tawney
Final Fail C/N issued. 3/2/2001 8:16:30 AM
BLD-Framing/Rough-in2/27/20012/28/20012/28/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/27/2001 at 10:03:00. Contact: .went over req for final. 2/28/2001 1:36:14 PM
BLD-Framing/Rough-in2/20/20012/21/20012/21/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/20/2001 at 12:45:20. Contact: .1st layer drywall at lid over office. 2/21/2001 1:52:18 PM
BLD-Framing/Rough-in2/14/20012/15/20012/15/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/14/2001 at 16:40:44. Contact: .Ok to cover new tall wall ,now constructed ok, architect has revised line of separation wall, ok as revised only i have requested a detail for the 1 hr horizontal portion of the wall over the office area. 2/15/2001 12:48:58 PM
BLD-Framing/Rough-in2/8/20012/9/20012/9/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/08/2001 at 11:43:47. Contact: ###-####.Need to have architect reveiw the existing construction and submit any neccessary revisions as the firewall at north of existing rest room is not being cont as plans. south of this is ok. also architect needs to provide a detail for support of the new tall firewall in the shop. went over these items with building tenant/contractor. 2/9/2001 10:56:48 AM