BLD-Aging Inspection | 1/22/2003 | 1/22/2003 | 1/22/2003 | | PASS |
Carl Dependahl
|
|
|
previously finalled by 415 & 409 1/22/2003 9:16:05 AM
|
BLD-Final | 4/24/2002 | 4/25/2002 | 4/25/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/24/2002 at 16:56:37. Contact: ###-####.
pending all trades 4/25/2002 2:45:27 PM
|
BLD-Final | 2/27/2002 | 2/27/2002 | 2/27/2002 | P | FAIL |
Carl Dependahl
|
|
|
ken ###-####; need ACHD, arch's letter re asbuilt landing ( has other ADA compliant entry...also, add'l work. proposed at main entry at rear.) provide 18"for ADA toilet to wall at mens room. 2/27/2002 3:16:58 PM
|
FIRE-Final Inspection | 2/7/2002 | 2/7/2002 | 2/7/2002 | P | PASS |
Rick Jackson
|
|
|
###-#### KEN
|
BLD-Aging Inspection | 12/18/2001 | 12/18/2001 | 12/18/2001 | | NR |
Carl Dependahl
|
|
|
awaiting fire, etc. 12/20/2001 6:53:26 PM
|
BLD-Aging Inspection | 10/16/2001 | 10/16/2001 | 10/16/2001 | | NR |
Carl Dependahl
|
|
|
spoke w/ Ken Grover...locks to be in by 11-1-01...obtain all finals for occupancy or notice to be issued. Time Zone is church youth center. 10/16/2001 10:13:10 AM
|
BLD-Aging Inspection | 8/16/2001 | 8/16/2001 | 8/16/2001 | | PASS |
Carl Dependahl
|
|
|
wip per Ken 8/16/2001 10:47:18 AM
|
BLD-Conference | 8/16/2001 | 8/16/2001 | 8/16/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/16/2001 10:46:51 AM w/ Ken re final status...need call for reinsp's.
|
BLD-Footing | 8/16/2001 | 8/16/2001 | 8/16/2001 | A | CANC |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/16/2001 10:44:07 AM
|
BLD-Conference | 6/15/2001 | 6/15/2001 | 6/15/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/15/2001 10:20:57 AM w/ owner's rep... need all finals prior to occupancy
|
FIRE-Final Inspection | 6/4/2001 | 6/4/2001 | 6/4/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### door hardware and repair exit sign 6/4/2001 1:45:26 PM
|
BLD-Conference | 5/31/2001 | 5/31/2001 | 5/31/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/31/2001 9:54:34 AM w/ Ken, church proj mgr...need all other finals as req'd for occupancy.
|
BLD-Conference | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/31/2001 1:09:41 PM w/ Ken, proj. mgr....have card signed off or verify approvals for occupancy.
|
BLD-Aging Inspection | 5/21/2001 | 5/21/2001 | 5/21/2001 | | FAIL |
Carl Dependahl
|
|
|
called 5/21/2001 5:23:16 PM
|
BLD-Conference | 3/21/2001 | 3/21/2001 | 3/21/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/21/2001 12:12:33 PM w/ Pastor at site, removed urethane foam at lid; ok
|
BLD-Framing/Rough-in | 3/14/2001 | 3/15/2001 | 3/15/2001 | A | PART |
Tony Young
|
|
|
###-#### grouting at 11:30
wip, grouting before 11:00 verbal conference w/ contractor, corrections taken care of, ok to continue, pending S. I. reort on eppoxy dowels. 3/15/2001 11:36:33 AM
|
BLD-Framing/Rough-in | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | PART |
Carl Dependahl
|
|
|
Ken Grover ###-#### ok to cover int walls, urethane removed from lid 3/15/2001 4:02:30 PM
|
BLD-Conference | 3/13/2001 | 3/13/2001 | 3/13/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/13/2001 6:38:52 PM ok to coverint partitions...submit for new clg & protection for interior per ch. 26.
|
BLD-Framing/Rough-in | 3/5/2001 | 3/6/2001 | 3/6/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-####; c/n, fireblocks, insul. face paper exposed at "plenum", need specs for monokote for thermal barrier & foam sprayed at lid...complete 2hr parapet. 3/6/2001 11:51:21 AM
|