Permit NumberBLD00-03639
StatusFinaled
Name URBAN RENEWAL AGENCY OF BOI SE
Site Address 1276 W RIVER ST
Project NameRIVER PLAZA-1ST FLR
Customer Number 
ePlanReviewNo
Description
To construct a 6,540 sq.ft. office tenant on the 1st floor per approved plans on file. This tenant is finishing the first floor. Work to include installation of interior walls, electrical, and HVAC system and finish. NOTE: This building is fully fire sprinklered for 1-hr. fire resistive substitution. MJP (P.C.#1047-00)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/12/20017/13/20017/13/2001APASS
DetailsCarl Dependahl
###-####
Permanent Occupancy 7/13/20017/13/2001 DONE
Details
BLD-Aging Inspection6/18/20016/18/20016/18/2001 PASS
DetailsCarl Dependahl
need all shell items 6/18/2001 9:16:12 AM
BLD-Final4/16/20014/16/20014/16/2001PNR
DetailsCarl Dependahl
###-####, need shell finalled prior to c/o...may extend temp if need 1 time 4/16/2001 3:25:45 PM
BLD-Final3/13/20013/13/20013/13/2001PFAIL
DetailsCarl Dependahl
###-####, complete draft stops; ok for t/o 3/13/2001 6:19:25 PM
FIRE-Final Inspection3/13/20013/13/20013/13/2001APASS
DetailsRick Jackson
Added by Inspector: 409 On 3/13/2001 11:53:16 AM
FIRE-Final Inspection3/12/20013/12/20013/12/2001AFAIL
DetailsRick Jackson
Added by Inspector: 409 On 3/12/2001 8:23:44 AM need sprinkler plans
BLD-Conference3/8/20013/8/20013/8/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/8/2001 9:21:20 AM need 1hr ext wall at east; complete gyp at 1hr stairs
BLD-Conference3/6/20013/6/20013/6/2001PPASS
DetailsCarl Dependahl
571--0990...c/n re gyp at 1hr stairs 3/6/2001 4:06:48 PM
BLD-Final3/5/20013/5/20013/5/2001PFAIL
DetailsCarl Dependahl
###-####, not final 3/5/2001 6:04:42 PM
BLD-Framing/Rough-in3/5/20013/5/20013/5/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/5/2001 6:06:07 PM part, ok to tile perimeters, pend other insps. Add seismic braces as needed at all rooms over 144 sf.
BLD-Framing/Rough-in2/23/20012/23/20012/23/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/23/2001 11:16:19 AM KEEP C/N...COMPLETE DRAFT STOP PER DISCUSSION
BLD-Conference2/21/20012/21/20012/21/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/21/2001 4:46:19 PM need seal draft stop
BLD-Conference1/29/20011/29/20011/29/2001PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/29/2001 at 09:33:28. Contact: ###-####. w/ arch & contractors...re c/n. add draft stop, complete gyp at stairs 1/29/2001 3:59:43 PM
BLD-Framing/Rough-in1/25/20011/25/20011/25/2001PFAIL
DetailsCarl Dependahl
united way 1st floor carl ###-#### & tom-- ###-####, c/n fireblocks, draft stops at floor clg; ok to cover steel stud framing only. need complete gyp at stairs. 1/25/2001 4:16:09 PM