BLD-Final | 5/17/2001 | 5/18/2001 | 5/18/2001 | A | PASS |
Dave Hannah
|
|
|
Terry ###-#### 5/18/2001 9:16:37 AM c.c.#20344 issued 5/18/2001 9:22:04 AM
|
BLD-Final | 5/15/2001 | 5/16/2001 | 5/16/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/15/2001 at 16:57:34. Contact: . need a elec and a mec final 5/16/2001 11:09:22 AM
|
BLD-Final | 4/12/2001 | 4/13/2001 | 4/13/2001 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/12/2001 at 14:41:32. Contact: . Disp set to [CANC] by a contractor via Hello! on 04/13/2001 at 10:56:01.
|
BLD-Wall cover | 2/21/2001 | 2/22/2001 | 2/22/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/21/2001 at 11:59:35. ok to cover, received engineering on grider truss in garage per plan reviewer request, indicating this will carry load of bonus and roof. 2/22/2001 11:36:57 AM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/21/2001 | 2/21/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 14:31:03. Contact: . c/n posted on site. 2/21/2001 11:05:23 AM
|
BLD-Framing/Rough-in | 2/19/2001 | 2/20/2001 | 2/20/2001 | A | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/19/2001 at 15:40:58. Contact: .Mechanical needed--no approved plans on site. 2/20/2001 9:17:58 AM
|
BLD-Framing/Rough-in | 2/20/2001 | 2/20/2001 | 2/20/2001 | P | NR |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 10:50:13. Contact: . Mechanical rough in not completed. 2/20/2001 2:26:07 PM
|
BLD-Other | 2/12/2001 | 2/13/2001 | 2/13/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/12/2001 at 14:06:45. Contact: . Shear OK---Ok to side. 2/13/2001 10:07:24 AM
|
BLD-Other | 2/6/2001 | 2/7/2001 | 2/7/2001 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/06/2001 at 13:49:01. Contact: .c/n issued--hd straps not nailed, many shear panels not stapled per plans, staples needed above hd straps, site address needs posted. 2/7/2001 2:49:55 PM
|
BLD-Foundation | 1/17/2001 | 1/17/2001 | 1/17/2001 | P | PART |
Steven Webb
|
|
|
Mana ###-#### Appears ok, not totally ready for concrete at time of inspection, hd not inplace. 1/17/2001 3:48:48 PM
|
BLD-Footing | 1/16/2001 | 1/16/2001 | 1/16/2001 | P | PART |
Steven Webb
|
|
|
setback & 1/16/2001 3:07:57 PM soil conditions ok, reviewed rebar & HD with contractor. 1/16/2001 3:08:33 PM
|