Permit Information
Permit NumberBLD00-03643
StatusFinaled
Name PIERCE PARK BAPTIST CHURCH
Site Address 5350 N PIERCE PARK LN
Project NamePIERCE PARK BAPTIST CHURCH
Customer Number 
ePlanReviewNo
Description
To construct a 12,090 sq. ft. one story, Type V1hr, church including a porte-cochere and pedestrian walk-way attached to the existing building on the site. Other work includes all site improvements and landscaping per approved plans and attachments. MLO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/17/20036/18/20036/18/2003APASS
DetailsTony Young
###-#### bill ceiling grid corrections in kitchen & dressing rooms
ok for perm. occ. 6/18/2003 11:24:32 AM
Permanent Occupancy 6/18/20036/18/2003 DONE
Details
BLD-Final5/23/20035/23/20035/23/2003PPART
DetailsTony Young
bill; Phone #: ###-#### Internet Inspection Request from: Annette Moore
c/n posted on ceiling grid,,, ok for temp.. occ. 5/23/2003 3:37:43 PM
Code Occupancy Approval5/23/20035/23/20035/23/2003AFAIL
DetailsWm. Michael Meloy
Inspection noted that "island area" in rear parking does not have the necessary grass/sod/or hydroseed. I spoke with Bill ###-####, and told him that if he wants a temp, he needs to bond. I approved $1,000 as a bond for the project. 5/23/2003 11:11:34 AM
FIRE-Final Inspection5/21/20035/21/20035/21/2003PPASS
DetailsRick Jackson
BILL; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in4/30/20034/30/20034/30/2003PPASS
DetailsTony Young
###-####
window in sep. wall,, infill 4/30/2003 4:58:48 PM
BLD-Conference4/25/20034/25/20034/25/2003PDONE
DetailsJim Storey
bill; Phone #: ###-#### Internet Inspection Request from: Annette Moore need to remove cassing in occ. septration wall and frame out to rated wall before to close opening in office. 4/25/2003 2:44:58 PM
BLD-Conference4/7/20034/8/20034/8/2003APASS
DetailsTony Young
conf. on schedule, etc.
wip, ok,, slow progress 4/8/2003 9:23:47 AM
BLD-Aging Inspection4/7/20034/7/20034/7/2003 PASS
DetailsTony Young
BLD-Conference2/4/20032/4/20032/4/2003PPASS
DetailsTony Young
###-#### needs ext.,,,,,,,, ok 2/4/2003 4:15:18 PM
BLD-Aging Inspection1/9/20031/9/20031/9/2003 PART
DetailsTony Young
wip 1/13/2003 2:24:13 PM
FIRE-Conference8/20/20028/21/20028/21/2002ADONE
DetailsTroy Cobbley
building has been built 8' south than the original plan shows thus narrowing one of the fire dept access roads. I told contractor that he needs to converse with Richard Dailey to verify if the narrower road will be OK. 8/21/2002 9:27:57 AM
BLD-Final3/11/20023/12/20023/12/2002ANR
DetailsTony Young
fn ###-####- bill--
framing inspection only, not final, framing ok to cover 3/12/2002 9:47:18 AM
BLD-Framing/Rough-in3/12/20023/12/20023/12/2002APASS
DetailsTony Young
Added by Inspector: 415 On 3/12/2002 9:44:36 AM
BLD-Framing/Rough-in3/7/20023/8/20023/8/2002APART
DetailsDave Hannah
###-#### BILL all but two items completed need to seal holes in drsft stop in attic need to fire caulk holes in top and bottom plates 3/8/2002 12:16:28 PM
BLD-Foundation2/25/20022/25/20022/25/2002PCANC
DetailsTony Young
###-####
BLD-Framing/Rough-in2/25/20022/25/20022/25/2002PPART
DetailsTony Young
bill 602--0369 2/25/2002 2:40:00 PM
c/n posted,,,ok to insulate 2/25/2002 4:26:04 PM
BLD-Conference1/23/20021/24/20021/24/2002APASS
DetailsTony Young
firedoor issues 1/23/2002 4:51:29 PM
BLD-Conference1/23/20021/23/20021/23/2002PPASS
DetailsTony Young
write on plans about fire doors 1/23/2002 10:13:12 AM
BLD-Conference1/17/20021/22/20021/22/2002APART
DetailsTony Young
for conf--###-#### bill
conf. on fire doors, need to review 1/22/2002 4:02:20 PM
BLD-Conference1/22/20021/22/20021/22/2002PPART
DetailsTony Young
update on fire doors 1/22/2002 11:25:57 AM
reviewed plans w/ 340 and 325 and determined that ext. glass doors do not need to be rated doors as noted on plans as long as exit corridors are maintained through other exits 1/23/2002 11:29:08 AM
BLD-Aging Inspection1/1/20021/1/20021/1/2002 PART
DetailsTony Young
wip 1/2/2002 8:53:52 AM
BLD-Framing/Rough-in11/1/200111/1/200111/1/2001PPART
DetailsTony Young
###-####9
exterior firewall ok to cover, 11/1/2001 3:59:46 PM
BLD-Conference10/4/200110/5/200110/5/2001APASS
DetailsTony Young
fire dampers 10/4/2001 3:42:56 PM
met w/ carl 340, fire dampers reqd. in all ceilings 5 /1 hr const. reqmts 10/5/2001 10:30:46 AM
BLD-Conference10/2/200110/3/200110/3/2001ACANC
DetailsTony Young
check on smoke/fire dampers, where? 10/2/2001 2:52:40 PM
BLD-Conference9/27/20019/28/20019/28/2001PCANC
DetailsTony Young
9/27/2001 5:08:24 PM
BLD-Conference9/28/20019/28/20019/28/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/28/2001 11:53:28 AM w/ Bill, supt re 1hr const, dampers & firestops.
BLD-Conference9/10/20019/11/20019/11/2001PPASS
DetailsTony Young
go over fire blocking w/ Bill, and what material 9/11/2001 11:02:47 AM
BLD-Framing/Rough-in9/10/20019/10/20019/10/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/10/2001 at 10:23:15. Contact: .
walk through only, conf. on attic venting 9/10/2001 4:30:26 PM
BLD-Aging Inspection8/6/20018/6/20018/6/2001 PASS
DetailsTony Young
wip 8/7/2001 12:16:28 PM
BLD-Foundation5/31/20016/1/20016/1/2001APASS
DetailsDave Hannah
###-#### POURING AT 10
BLD-Foundation5/29/20015/29/20015/29/2001PPART
DetailsTony Young
around 3:00 Bill ###-####
BLD-Footing5/24/20015/25/20015/25/2001APART
DetailsTony Young
Bill Wall ###-####
wip, natural soil ok 5/25/2001 9:27:05 AM
BLD-Conference5/22/20015/22/20015/22/2001PPASS
DetailsTony Young
Bill ###-####
ftg soil compaction, etc. 5/22/2001 4:19:37 PM
BLD-Footing5/21/20015/21/20015/21/2001PPART
DetailsTony Young
bill ###-####
ok after compaction test is passed, pending report//wip, verbal corrections 5/21/2001 1:53:41 PM
BLD-Footing5/17/20015/18/20015/18/2001APART
DetailsCarl Dependahl
ft insp -- ###-####- bill...int ftgs, some of north fnd wall 5/18/2001 8:50:26 AM
BLD-Footing5/15/20015/16/20015/16/2001APART
DetailsTony Young
###-####
looked @ north 1/2 of ftgs, ok w/ verbal corrections, mti on the way, ? on if a s.i. was needed but architect said design is 2500 psi 5/16/2001 11:53:40 AM