BLD-Final | 4/4/2001 | 4/5/2001 | 4/5/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
FIRE-Final Inspection | 4/4/2001 | 4/5/2001 | 4/5/2001 | P | PASS |
Joe Tawney
|
|
|
JC ###-#### Reinsp OK for permanant occupancy 4/5/2001 6:10:15 PM
|
Permanent Occupancy | | 4/5/2001 | 4/5/2001 | | DONE |
|
|
|
|
BLD-Final | 4/5/2001 | 4/4/2001 | 4/4/2001 | P | FAIL |
Joe Tawney
|
|
|
Added by Inspector: 406 On 4/5/2001 8:30:30 AM Final Fail C/N issued
|
BLD-Other | 3/20/2001 | 3/20/2001 | 3/20/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 3/20/2001 11:56:30 AM grid. 3/20/2001 1:55:39 PM
|
BLD-Framing/Rough-in | 3/15/2001 | 3/19/2001 | 3/19/2001 | P | NR |
Russ Owen
|
|
|
###-####
|
BLD-Other | 3/6/2001 | 3/7/2001 | 3/7/2001 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 09:57:06. Contact: ###-####.
|
BLD-Other | 2/22/2001 | 2/23/2001 | 2/23/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/22/2001 at 10:45:56. Contact: ###-####.east side of building ok grid. 2/23/2001 11:11:37 AM
|
BLD-Other | 2/20/2001 | 2/22/2001 | 2/22/2001 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/20/2001 at 08:48:43. Contact: ###-####.will recall . 2/22/2001 10:13:45 AM
|
BLD-Framing/Rough-in | 2/9/2001 | 2/12/2001 | 2/12/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/09/2001 at 15:20:25. Contact: ###-####.ok to complete all rock. 2/12/2001 12:35:33 PM
|
BLD-Framing/Rough-in | 2/5/2001 | 2/6/2001 | 2/6/2001 | P | PART |
Russ Owen
|
|
|
interior non bearing walls ok to cover. 2/6/2001 5:12:40 PMonly small office section left 90 percent complete. 2/6/2001 5:13:09 PM
|
BLD-Framing/Rough-in | 1/26/2001 | 1/29/2001 | 1/29/2001 | A | PART |
Russ Owen
|
|
|
JC ###-####ok to cover east portion of area A. with rock no ceiling grid at this time. 1/29/2001 11:13:27 AM
|
BLD-Framing/Rough-in | 1/26/2001 | 1/26/2001 | 1/26/2001 | A | PART |
Russ Owen
|
|
|
Added by Inspector: 407 On 1/26/2001 12:15:26 PM partial inspection of the planed 3 phase interior,left east side at this time,no approved plans on site will recall for inspection on 1/29/01.
|