BLD-Final | 6/27/2002 | 7/22/2002 | 7/22/2002 | A | PASS |
Tony Young
|
|
|
verify landings, driveway, drainage from house, and firewall seal 7/23/2002 10:08:41 AM
|
BLD-Final | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PART |
Tony Young
|
|
|
ok to temp occupy now, need to verify other issues later as scheduled 6/27/2002 2:50:28 PM
|
BLD-Grading Inspection | 6/26/2002 | 6/26/2002 | 6/26/2002 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is approved.
|
BLD-Final | 6/25/2002 | 6/25/2002 | 6/25/2002 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 10:22:56. Contact: ###-####.conf. only, need trades signed off 6/25/2002 2:23:09 PM
|
BLD-Framing/Rough-in | 3/21/2002 | 3/21/2002 | 3/21/2002 | P | PASS |
Tony Young
|
|
|
re-insp on wall cover- ###-#### mel
|
BLD-Wall cover | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/18/2002 at 08:36:05. Contact: ###-####. C/N posted. 3/18/2002 4:40:35 PM
|
BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/10/2001 | | PART |
Tony Young
|
|
|
wip 12/12/2001 8:54:23 AM
|
BLD-Framing/Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 | P | PART |
Tony Young
|
|
|
###-#### MIKE SHEER NAIL /ROOF INSPECTION
ext ok 10/10/2001 2:15:54 PM
|
BLD-Framing/Rough-in | 10/9/2001 | 10/9/2001 | 10/9/2001 | P | PART |
Tony Young
|
|
|
###-#### MIKE SHEER NAIL OUT SIDE ONLY
c/n on nailing 10/10/2001 10:29:34 AM
|
BLD-Aging Inspection | 9/18/2001 | 9/18/2001 | 9/18/2001 | | PASS |
Tony Young
|
|
|
wip 9/18/2001 11:41:04 AM
|
BLD-Foundation | 7/18/2001 | 7/19/2001 | 7/19/2001 | A | PART |
Tony Young
|
|
|
brent ###-####
wip, verbal corrections 7/19/2001 10:24:05 AM
|
BLD-Footing | 7/16/2001 | 7/17/2001 | 7/17/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 07/16/2001 at 14:13:55. Contact: ###-####.ok to pour pending soil engineer approval 7/17/2001 10:46:54 AM
|