Permit Information
Permit NumberBLD01-00002
StatusFinaled
Name PRESTIGE HOMES INC
Site Address 6285 S KELTON PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1837 sq. ft. two story single family dwelling with a 928 sq. ft. attached three car garage, a 38 sq. ft. covered entry way and a 140 sq. ft. concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 1265 sq. ft.)(2nd floor 572 sq. ft.) PC #001 DJO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/20/20014/20/20014/20/2001APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 04/20/2001 at 07:04:04. Contact: ###-####. C. of C. #20414 issued. 4/20/2001 8:49:27 AM
BLD-Energy code compliance3/7/20013/7/20013/7/2001PPASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/07/2001 at 11:17:20. Contact: ###-####.
BLD-Framing/Rough-in3/6/20013/6/20013/6/2001PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/06/2001 at 10:26:09. Contact: ###-####.c/n issued--solid bearing under 4X10 header and straps, plus eng. requested on 3/2/01 c/n stills needed on T9 truss. Ok to insulate. 3/6/2001 3:22:36 PM
BLD-Framing/Rough-in3/2/20013/2/20013/2/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 03/02/2001 at 07:24:42. Contact: ###-####. C/n issued--Grider per plans is 2 M. Lam--installed in I-joist-provide eng. or replace, Per plans at start of hallway should be 4 X 10 header, not installed, fireblock landing of stairs, G.Lam in garage need solid connections on both sides, Truss T9 per plans should be M.Lam provide eng. on truss, Truss package needed on site to complete framing inspection. 3/2/2001 2:37:07 PM
BLD-Other3/1/20013/1/20013/1/2001APASS
DetailsSteven Webb
Scheduled by Inspector: 420 On 3/1/2001 10:21:24 AM SHEAR--Ok 3/1/2001 10:37:53 AM
BLD-Framing/Rough-in2/20/20012/21/20012/21/2001APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 02/20/2001 at 16:56:33. Contact: ###-####.Shear inspection--ok to side LOWER floor only--need to verify MSTC 40 straps before siding upper section. 2/21/2001 11:41:13 AM
BLD-Framing/Rough-in2/20/20012/20/20012/20/2001PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 02/20/2001 at 07:47:19. Contact: ###-####. no approved plans on site 2/20/2001 3:01:14 PM
BLD-Foundation1/23/20011/24/20011/24/2001APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 01/23/2001 at 11:09:47. Contact: ###-####.hd not install at time of inspection 1/24/2001 11:32:27 AM
BLD-Footing1/23/20011/23/20011/23/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/23/2001 at 11:09:06. Contact: ###-####.