BLD-Final | 3/15/2001 | 3/16/2001 | 3/16/2001 | P | PASS |
Tom Arcoraci
|
|
|
###-#### ok for perm occ after elec signs perm 3/16/2001 2:16:36 PM
|
FIRE-Final Inspection | 3/15/2001 | 3/16/2001 | 3/16/2001 | P | PASS |
Joe Tawney
|
|
|
###-#### Reinsp OK for permanant occupancy 3/19/2001 8:05:00 AM
|
Permanent Occupancy | | 3/16/2001 | 3/16/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/15/2001 | 3/15/2001 | 3/15/2001 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail AHU duct detectors 3/16/2001 8:19:48 AM
|
BLD-Other | 3/6/2001 | 3/9/2001 | 3/9/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/06/2001 at 14:24:48. Contact: ###-####. pods as per manufactures specs ceiling grid, need letter from architect. 3/9/2001 11:09:04 AM
|
BLD-Framing/Rough-in | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | PASS |
Russ Owen
|
|
|
JC ###-####
|