Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-00033
StatusFinaled
Name ROBERT HALF INTERNATIONAL INC
Site Address 800 PARK BLVD Unit: (7 FLR)
Project NameMK PLAZA IV - 7TH FLR
Customer Number 
ePlanReviewNo
Description
(ROBERT HALF INTERNATIONAL) This building is fire sprinklered to meet high-rise provisions and for building area increase. To create a new 4,000 square foot office tenant space on the 7th floor of MK Plaza IV (North Side). This tenant space will take about 500 square feet of the adjacent tenant space (University of Idaho). Work is to include 1-hr corridor walls and tunnel, new and relocated corridor doors, and interior nonbearing walls all per approved drawings and plan review conditions on file. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. PC-0011-01 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 4/19/20014/19/2001 DONE
Details
BLD-Final4/13/20014/13/20014/13/2001PPART
DetailsTony Young
###-####
temp. occ. ok until plumbing is signed off, and door seals are on (missing one on double door) 4/13/2001 1:07:41 PM
FIRE-Final Inspection4/12/20014/12/20014/12/2001PPASS
DetailsRick Jackson
###-####
BLD-Framing/Rough-in4/2/20014/2/20014/2/2001PPASS
DetailsRuss Owen
ceiling insp ken ###-####
BLD-Framing/Rough-in3/30/20013/30/20013/30/2001PFAIL
DetailsSteven Webb
###-#### C/n posted--wires need attention--wraps per code. elec. and mechanical approval to cover. 3/30/2001 3:14:09 PM
BLD-Conference3/16/20013/16/20013/16/2001PPASS
DetailsTony Young
###-####,framing inspection 3/16/2001 11:22:31 AM
ok to cover walls 3/16/2001 12:51:49 PM
BLD-Conference3/5/20013/5/20013/5/2001PPASS
DetailsTony Young
conf. on framing inspections to keep tenants in while doing work 3/5/2001 2:24:57 PM