BLD-Final | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | PASS |
Russ Owen
|
|
|
only running on temp needs final occ\###-####. ok for a permanent occupancy. 7/25/2001 10:28:58 AM
|
Permanent Occupancy | | 7/25/2001 | 7/25/2001 | | DONE |
|
|
|
|
BLD-Final | 7/23/2001 | 7/23/2001 | 7/23/2001 | P | NR |
Russ Owen
|
|
|
###-####. contractor called me said he bathroom grab bar in place but does not have lateral ceiling pods in yet. 7/23/2001 3:39:01 PM
|
BLD-Aging Inspection | 7/4/2001 | 7/4/2001 | 7/4/2001 | | PART |
Russ Owen
|
|
|
went out to job .corrections were to add 42 in grab bar at rest room and ceiling pods,and i checked , but this has not been done i left buiseness card with worker and asked if they could have store manager call me. 7/6/2001 12:35:01 PM
|
BLD-Final | 4/23/2001 | 4/24/2001 | 4/24/2001 | A | PART |
Russ Owen
|
|
|
fn occ ben-- ###-#### Ok for temp oc ,only c/n is for ceiling grid pods,and left side grab bar in H/C rest room. posted with plans. 11/24/2001 10:59:20 AM
|
FIRE-Final Inspection | 4/23/2001 | 4/24/2001 | 4/24/2001 | A | PASS |
Joe Tawney
|
|
|
Ben ###-#### REinsp OK for permanant occupancy 4/23/2001 5:11:38 PM
|
FIRE-Final Inspection | 4/20/2001 | 4/23/2001 | 4/23/2001 | A | FAIL |
Joe Tawney
|
|
|
Reinsp Fail Door Hdwre 4/23/2001 12:24:03 PM
|
FIRE-Final Inspection | 4/19/2001 | 4/20/2001 | 4/20/2001 | A | FAIL |
Joe Tawney
|
|
|
###-####. 4/20/2001 1:33:41 PM Final Fail C/N issued 4/20/2001 2:27:02 PM
|
BLD-Final | 4/19/2001 | 4/19/2001 | 4/19/2001 | P | CANC |
Russ Owen
|
|
|
late pm scott ###-#### Called contractor told him he would need all required signatures on occupancy card , also told him that a grid ceiling inspection had not been done, need to check this adn 1 brace at front sofit was left on a c/n for frame insp. will recall when ready. 11/19/2001 3:50:53 PM
|
BLD-Framing/Rough-in | 3/29/2001 | 3/29/2001 | 3/29/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 09:06:22. Contact: .ok to cover need 1 brace at 45 added to the soffit over counter, verifiy at next insp, ceiling not yet in place. 3/29/2001 2:38:29 PM
|
BLD-Framing/Rough-in | 3/26/2001 | 3/27/2001 | 3/27/2001 | A | FAIL |
Russ Owen
|
|
|
asap if possible\\###-#### soffit not per plans mec insp req. 3/27/2001 1:02:36 PM
|
BLD-Framing/Rough-in | 3/12/2001 | 3/12/2001 | 3/12/2001 | P | FAIL |
Russ Owen
|
|
|
after 2 ###-####.no approved plans on site. 3/12/2001 1:47:00 PM
|