BLD-Final | 2/27/2002 | 2/28/2002 | 2/28/2002 | A | PASS |
Carl Dependahl
|
|
|
fn pat ###-#### ; ok for c/o 2/28/2002 10:59:31 AM
|
Permanent Occupancy | | 2/28/2002 | 2/28/2002 | | DONE |
|
|
|
|
BLD-Final | 2/22/2002 | 2/25/2002 | 2/25/2002 | P | NR |
Tom Arcoraci
|
|
|
###-#### pat wanted p/z 2/25/2002 1:50:12 PM
|
BLD-Final | 1/22/2002 | 1/23/2002 | 1/23/2002 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/22/2002 at 14:17:02. Contact: ###-####. c/n, stair rail height, complete gyp at bsmt, misc ext-int finish; other agcy perm. finals. ok for t/o. 1/23/2002 6:11:59 PM
|
FIRE-Final Inspection | 1/15/2002 | 1/15/2002 | 1/15/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 01/15/2002 at 10:03:23. Contact: ###-####.
|
FIRE-Final Inspection | 12/13/2001 | 12/12/2001 | 12/12/2001 | P | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 12/13/2001 7:24:41 AM exit signs; south exit doors sticking
|
FIRE-Alarm Testing | 11/15/2001 | 11/16/2001 | 11/16/2001 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/15/2001 at 16:48:29. Contact: ###-####. PAT CANC THIS INSPECTION 11-16-01
|
FIRE-Alarm Testing | 11/15/2001 | 11/16/2001 | 11/16/2001 | P | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/15/2001 at 16:48:29. Contact: ###-####. contractor called and said he would reschedule 11/16/2001 11:50:42 AM
|
BLD-Framing/Rough-in | 10/26/2001 | 10/29/2001 | 10/29/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/26/2001 at 11:33:27. Contact: ###-####.Contractor here on site said 340 came by on friday pm. 10/29/2001 1:23:34 PM
|
BLD-Framing/Rough-in | 10/23/2001 | 10/24/2001 | 10/24/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/23/2001 at 15:57:02. Contact: ###-####. main fl (only) restroom lids ok, seal "boxes" at penetrations. 10/24/2001 5:12:32 PM
|
BLD-Conference | 10/22/2001 | 10/22/2001 | 10/22/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/22/2001 6:49:02 PM w/ bldr re eng'g for glass rails...insp req'd
|
BLD-Framing/Rough-in | 10/18/2001 | 10/19/2001 | 10/19/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/18/2001 at 13:30:48. Contact: ###-####. ok to install lid at 1st fl of add'n, exc at restrooms 10/19/2001 11:44:15 AM
|
BLD-Conference | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/18/2001 6:08:43 PM rec'd add'l calcs for glass guards...appears ok.
|
BLD-Conference | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/12/2001 11:28:53 AM w/ elec re can lites....ok to seal per ubc 709 10/12/2001 5:24:20 PM
|
BLD-Other | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/12/2001 at 11:00:13. Contact: ###-####.reviewed corrections. 10/12/2001 4:03:20 PM
|
FIRE-Conference | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### MARGIE; need mock up of protection of can lites of 1hr...pads or tents??? 10/12/2001 11:26:43 AM
|
BLD-Conference | 10/5/2001 | 10/5/2001 | 10/5/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/5/2001 3:07:33 PM w/ arch...keep c/n re can lite penetrations at 1hr lid...need tents or approved assy.
|
BLD-Framing/Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 10:25:07. Contact: ###-####. ok to start covering third floor still need to check 1hr fire assm on fans ligths ext 9/17/2001 2:23:43 PM
|
BLD-Framing/Rough-in | 9/12/2001 | 9/13/2001 | 9/13/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 15:06:58. Contact: ###-####. c/n re firestops, trusses at brg, shaft assy . ok to insul & "1 side " rock. 9/13/2001 12:19:37 PM
|
BLD-Conference | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 14:36:28. Contact: ###-####...pre-con & walk-thru. 1hr add'n
8/17/2001 12:11:35 PM
|
BLD-Conference | 7/13/2001 | 7/13/2001 | 7/13/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/13/2001 10:04:56 AM w/ Pat, supt. need eng'd detail for ledger/framing/steel at existing struct masonry wall...wip, ok to continue
|
BLD-Conference | 7/11/2001 | 7/11/2001 | 7/11/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/11/2001 10:37:29 AM w/ Pat,( supt. w/ gen'l contractor ) need to verify 1hr assys at floor/clg, firestopping, draftstops, See plan chk. note 67.
|
BLD-Concrete | 6/15/2001 | 6/15/2001 | 6/15/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/15/2001 10:25:07 AM w/ Pat , supt w/ KJ const. MTI insp & Sommer masonry foreman onsite re design & insps; walls are topped out w/ add'l #6 bars at bond beam... verts will be cut off when grout set-pending MTI report
|
BLD-Conference | 6/15/2001 | 6/15/2001 | 6/15/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/15/2001 10:26:37 AM need rfi for design of attachment of floor & roof to existing due to masonry deficiencies
|
BLD-Other | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 15:50:53. Contact: ###-####.masonry, has mti sched'd 6/13/2001 9:25:15 AM
|
BLD-Other | 6/11/2001 | 6/12/2001 | 6/12/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/11/2001 at 15:19:41. Contact: ###-####. spec required on colm see plan 6/11/2001 9:51:54 PM
|
BLD-Other | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 10:08:45. Contact: ###-####. mti on site 6/12/2001 1:17:01 AM
|
BLD-Foundation | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 11:19:35. Contact: ###-####.
|
BLD-Footing | 5/2/2001 | 5/3/2001 | 5/3/2001 | A | PART |
Tom Arcoraci
|
|
|
ft insp pat- ###-#### done by 340 5/3/2001 10:05:32 AM
|
BLD-Footing | 5/3/2001 | 5/3/2001 | 5/3/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/3/2001 12:14:57 PM elev shaft wall & perim ftgs at bsmt..ok pend soils report & clarification of design values (2500 psi design?) pour at own risk.
|
BLD-Footing | 5/2/2001 | 5/3/2001 | 5/2/2001 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 14:46:38. Contact: ###-####.--per pat cancel rescheduled/mls
|
BLD-Footing | 5/1/2001 | 5/2/2001 | 5/2/2001 | P | PART |
Tony Young
|
|
|
ft insp pat ###-####
elevator shaft ftg., wip, ok to pour when ready, no s. i. reqd. design is 2500 psi. 5/2/2001 1:34:52 PM
|