Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-00106
StatusFinaled
Name FIRST BAPTIST CHURCH
Site Address 607 N 13TH ST
Project NameFIRST BAPTIST CHURCH
Customer Number 
ePlanReviewNo
Description
(FIRST BAPTIST CHURCH - ADDITION AND REMODEL) This building IS NOT fire sprinklered. To construct a 1,335 square foot basement, 1,335 square foot first floor, and a 1,335 square foot second floor addition to an existing 25,245 square foot church building. The existing building has been placed on a historic register. After the addition the building will have a total floor area of 29,250 square feet (including basement). Work is to include concrete footings and foundations, masonry block walls, brick veneer, concrete floor, wood floors, interior bearing walls, suspended gypsum board ceilings, steel and wood columns, steel and wood beams, an elevator and shaft, and six (6) restrooms accessible to the disabled all per approved drawings, engineering, and plan review conditions on file. DRH00-00245 CUP00-00149 PC-034-01 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/27/20022/28/20022/28/2002APASS
DetailsCarl Dependahl
fn pat ###-#### ; ok for c/o 2/28/2002 10:59:31 AM
Permanent Occupancy 2/28/20022/28/2002 DONE
Details
BLD-Final2/22/20022/25/20022/25/2002PNR
DetailsTom Arcoraci
###-#### pat wanted p/z 2/25/2002 1:50:12 PM
BLD-Final1/22/20021/23/20021/23/2002PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/22/2002 at 14:17:02. Contact: ###-####. c/n, stair rail height, complete gyp at bsmt, misc ext-int finish; other agcy perm. finals. ok for t/o. 1/23/2002 6:11:59 PM
FIRE-Final Inspection1/15/20021/15/20021/15/2002PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/15/2002 at 10:03:23. Contact: ###-####.
FIRE-Final Inspection12/13/200112/12/200112/12/2001PFAIL
DetailsRick Jackson
Added by Inspector: 409 On 12/13/2001 7:24:41 AM exit signs; south exit doors sticking
FIRE-Alarm Testing11/15/200111/16/200111/16/2001PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/15/2001 at 16:48:29. Contact: ###-####. PAT CANC THIS INSPECTION 11-16-01
FIRE-Alarm Testing11/15/200111/16/200111/16/2001PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/15/2001 at 16:48:29. Contact: ###-####. contractor called and said he would reschedule 11/16/2001 11:50:42 AM
BLD-Framing/Rough-in10/26/200110/29/200110/29/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/26/2001 at 11:33:27. Contact: ###-####.Contractor here on site said 340 came by on friday pm. 10/29/2001 1:23:34 PM
BLD-Framing/Rough-in10/23/200110/24/200110/24/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/23/2001 at 15:57:02. Contact: ###-####. main fl (only) restroom lids ok, seal "boxes" at penetrations. 10/24/2001 5:12:32 PM
BLD-Conference10/22/200110/22/200110/22/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/22/2001 6:49:02 PM w/ bldr re eng'g for glass rails...insp req'd
BLD-Framing/Rough-in10/18/200110/19/200110/19/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/18/2001 at 13:30:48. Contact: ###-####. ok to install lid at 1st fl of add'n, exc at restrooms 10/19/2001 11:44:15 AM
BLD-Conference10/18/200110/18/200110/18/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/18/2001 6:08:43 PM rec'd add'l calcs for glass guards...appears ok.
BLD-Conference10/12/200110/12/200110/12/2001PPART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 10/12/2001 11:28:53 AM w/ elec re can lites....ok to seal per ubc 709 10/12/2001 5:24:20 PM
BLD-Other10/12/200110/12/200110/12/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/12/2001 at 11:00:13. Contact: ###-####.reviewed corrections. 10/12/2001 4:03:20 PM
FIRE-Conference10/11/200110/12/200110/12/2001APART
DetailsCarl Dependahl
###-#### MARGIE; need mock up of protection of can lites of 1hr...pads or tents??? 10/12/2001 11:26:43 AM
BLD-Conference10/5/200110/5/200110/5/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/5/2001 3:07:33 PM w/ arch...keep c/n re can lite penetrations at 1hr lid...need tents or approved assy.
BLD-Framing/Rough-in9/17/20019/17/20019/17/2001PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 09/17/2001 at 10:25:07. Contact: ###-####. ok to start covering third floor still need to check 1hr fire assm on fans ligths ext 9/17/2001 2:23:43 PM
BLD-Framing/Rough-in9/12/20019/13/20019/13/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/12/2001 at 15:06:58. Contact: ###-####. c/n re firestops, trusses at brg, shaft assy . ok to insul & "1 side " rock. 9/13/2001 12:19:37 PM
BLD-Conference8/16/20018/17/20018/17/2001APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/16/2001 at 14:36:28. Contact: ###-####...pre-con & walk-thru. 1hr add'n
8/17/2001 12:11:35 PM
BLD-Conference7/13/20017/13/20017/13/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 7/13/2001 10:04:56 AM w/ Pat, supt. need eng'd detail for ledger/framing/steel at existing struct masonry wall...wip, ok to continue
BLD-Conference7/11/20017/11/20017/11/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 7/11/2001 10:37:29 AM w/ Pat,( supt. w/ gen'l contractor ) need to verify 1hr assys at floor/clg, firestopping, draftstops, See plan chk. note 67.
BLD-Concrete6/15/20016/15/20016/15/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/15/2001 10:25:07 AM w/ Pat , supt w/ KJ const. MTI insp & Sommer masonry foreman onsite re design & insps; walls are topped out w/ add'l #6 bars at bond beam... verts will be cut off when grout set-pending MTI report
BLD-Conference6/15/20016/15/20016/15/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/15/2001 10:26:37 AM need rfi for design of attachment of floor & roof to existing due to masonry deficiencies
BLD-Other6/12/20016/13/20016/13/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/12/2001 at 15:50:53. Contact: ###-####.masonry, has mti sched'd 6/13/2001 9:25:15 AM
BLD-Other6/11/20016/12/20016/12/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/11/2001 at 15:19:41. Contact: ###-####. spec required on colm see plan 6/11/2001 9:51:54 PM
BLD-Other6/12/20016/12/20016/12/2001PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/12/2001 at 10:08:45. Contact: ###-####. mti on site 6/12/2001 1:17:01 AM
BLD-Foundation5/8/20015/8/20015/8/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 05/08/2001 at 11:19:35. Contact: ###-####.
BLD-Footing5/2/20015/3/20015/3/2001APART
DetailsTom Arcoraci
ft insp pat- ###-#### done by 340 5/3/2001 10:05:32 AM
BLD-Footing5/3/20015/3/20015/3/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/3/2001 12:14:57 PM elev shaft wall & perim ftgs at bsmt..ok pend soils report & clarification of design values (2500 psi design?) pour at own risk.
BLD-Footing5/2/20015/3/20015/2/2001PCANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/02/2001 at 14:46:38. Contact: ###-####.--per pat cancel rescheduled/mls
BLD-Footing5/1/20015/2/20015/2/2001PPART
DetailsTony Young
ft insp pat ###-####
elevator shaft ftg., wip, ok to pour when ready, no s. i. reqd. design is 2500 psi. 5/2/2001 1:34:52 PM