Permit Information
Permit NumberBLD01-00107
StatusFinaled
Name PIONEER SQUARE (PHASE II)
Site Address 5161 W OVERLAND RD
Project NamePIONEER SQUARE PHASE II
Customer Number20009
ePlanReviewNo
Description
Pioneer Square Phase II, To construct a new 4,712 sq.ft. single story, wood framed, type V-nonrated, shell building only. All construction per the approved [plans, attached comment list and CABO/ANSI A117.1. NOTE: This is a shell building only. Separate permits and Certificate of Occupancies must be obtained to finish each units. DRH 00-00050/516 PC#0036-01 MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/26/200110/26/200110/26/2001PPASS
DetailsJim Sly
###-#### GREG
BLD-Final9/24/20019/25/20019/25/2001APART
DetailsRuss Owen
gregg ###-#### for temp occ. needs sign-off by zoning and s-i final report. 9/25/2001 12:51:51 PM
BLD-Framing/Rough-in9/24/20019/24/20019/24/2001PCANC
DetailsJoe Tawney
###-#### greg temp
BLD-Final9/17/20019/18/20019/18/2001ANR
DetailsTom Arcoraci
TEMP ONLY ###-#### GREG no code enf signature
9/17/2001 11:26:46 PM
FIRE-Final Inspection9/11/20019/12/20019/12/2001APASS
DetailsJoe Tawney
Reinsp OK for certificate of completion 9/12/2001 1:26:30 PM
BLD-Aging Inspection9/10/20019/10/20019/10/2001 PART
DetailsTom Arcoraci
wip 9/10/2001 3:08:09 AM
FIRE-Final Inspection9/10/20019/10/20019/10/2001PFAIL
DetailsJoe Tawney
Final Fail Plans incomplete for shell bldg 9/10/2001 3:33:47 PM
BLD-Framing/Rough-in7/9/20017/10/20017/10/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 07/09/2001 at 16:01:33. Contact: ###-####. steel beam installed on header 7/9/2001 9:45:19 PM
BLD-Framing/Rough-in6/12/20016/13/20016/13/2001PPART
DetailsDave Hannah
Scheduled by Inspector: 408 On 6/12/2001 10:23:26 PM ok to cover east and west walls need engineering change on center beam 6/13/2001 2:15:50 PM
BLD-Framing/Rough-in6/12/20016/13/20016/13/2001ACANC
DetailsTom Arcoraci
BLD-Framing/Rough-in6/12/20016/12/20016/12/2001PCANC
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 6/12/2001 10:19:04 PM
BLD-Framing/Rough-in6/8/20016/11/20016/11/2001ACANC
DetailsTom Arcoraci
###-####
BLD-Framing/Rough-in6/11/20016/11/20016/11/2001PNR
DetailsTom Arcoraci
as per tom rescheduled for pm today no plans on site will recall again 6/11/2001 1:50:54 AM
BLD-Framing/Rough-in6/10/20016/10/20016/10/2001PCANC
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 6/10/2001 8:49:39 PM 6/10/2001 9:26:24 PM
BLD-Wall cover6/6/20016/7/20016/7/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/06/2001 at 13:13:50. Contact: ###-####. ext shear nailing ok hd 8s not installed yet ext straps at north and west side installed 6/7/2001 11:07:03 AM
BLD-Wall cover6/1/20016/4/20016/4/2001APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/01/2001 at 12:21:15. Contact: ###-####. roof nailing ok 6/4/2001 10:09:56 AM
BLD-Foundation5/2/20015/3/20015/3/2001PPART
DetailsRuss Owen
AARON ###-#### special insp req. 12/3/2001 3:37:31 PM
BLD-Footing4/30/20015/1/20015/1/2001APART
DetailsTom Arcoraci
aaron ###-#### ok pending spec insp mti 5/1/2001 2:25:16 PM