Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-00138
StatusFinaled
Name C J BANKS
Site Address 350 N MILWAUKEE ST Unit: 2323
Project NameBTS - #2323
Customer Number 
ePlanReviewNo
Description
To construct a 4,497 sq.ft. retail tenant space on the upper level of the mall per approved plans on file. Work to include, demolition of existing interior finishes, partitions, and storefront. Construction of new noncombustible partitions to create storage area, dressing rooms, sales area, and an access hallway to the exit passage way. Construction of a new storefront glazing and bulkhead system and installation of a new rolldown security grill. Installation of a new suspended ceiling system, new flooring and miscelaneous related interior finishes. Separate permits required for Electrical, mechanical, plumbing and sign installation. NOTE: This building is fully fire sprinklered and has a smoke control system. Any alterations or modifications to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. The smoke evacuation system shall be maintained as installed under the 1985 UBC. (P.C.#0052-01)*RMH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/4/20014/5/20014/5/2001PPASS
DetailsCarl Dependahl
Kirk ###-#### #2323
FIRE-Final Inspection4/5/20014/5/20014/5/2001APASS
DetailsJoe Tawney
Kirk ###-#### Reinsp OK for permanant occupancy 4/5/2001 6:09:14 PM
FIRE-Final Inspection4/4/20014/5/20014/5/2001ACANC
DetailsJoe Tawney
reinspection Kirk ###-#### #2323
BLD-Final4/2/20014/3/20014/3/2001PCANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/02/2001 at 13:47:31. Contact: ###-####. cancelled by kirk
FIRE-Alarm Testing4/2/20014/3/20014/3/2001AFAIL
DetailsJoe Tawney
4/3/2001 5:35:40 PM Final Fail C/N issued 4/3/2001 5:36:02 PM
FIRE-Final Inspection4/2/20014/3/20014/3/2001AFAIL
DetailsJoe Tawney
4/3/2001 5:35:01 PM Final Fail C/N issued 4/3/2001 5:35:17 PM
BLD-Other3/28/20013/28/20013/28/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/28/2001 at 08:34:34. Contact: ###-####. t-bar grid ok dressing room complete 1 pod. 3/28/2001 4:52:51 PM
FIRE-Final Inspection3/27/20013/28/20013/28/2001APART
DetailsJoe Tawney
###-#### pager OK on spklr rough in 3/28/2001 1:18:23 PM
BLD-Framing/Rough-in3/15/20013/16/20013/16/2001APART
DetailsCarl Dependahl
Kirk ###-####, storefront & sidewalls ok ;bracing modified, ok as built3/16/2001 6:34:41 PM 3/16/2001 6:36:25 PM
BLD-Framing/Rough-in3/9/20013/9/20013/9/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/09/2001 at 07:46:14. Contact: .ok to cover all but ,bulk head ,const not started at this time. 3/9/2001 1:44:13 PM