Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-00139
StatusFinaled
Name BATH & BODY WORKS
Site Address 350 N MILWAUKEE ST Unit: 1049
Project NameBTS - #1049
Customer Number 
ePlanReviewNo
Description
To remodel a 4,215 sq.ft. existing retail tenant space per approved plans on file. Work to include, removing the tenant demising wall and incorporating adjacent tenant space into one space, construction of a new storefront system with roll up security grill, construction of new noncombustible partition, construction of one accessible restroom, construction of new one-hour rated egress access corridor, installation of a suspended ceiling system, Related miscelaneous interior finishes including shelving and counters. NOTE: This building is fully fire sprinklered and has a smoke control system. Any alteration or modification to the fire sprinkler system shall be per NFPA #13 as regulated by the fire department. The Smoke evacuation system shall be maintained as installed under the 1985 UBC. (P.C.#0051-01)*RMH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/1/20015/2/20015/2/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/01/2001 at 12:40:18. Contact: ###-####. ok for perm oc. 12/2/2001 10:34:38 AM
Permanent Occupancy 5/2/20015/2/2001 DONE
Details
BLD-Final4/30/20015/1/20015/1/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/30/2001 at 14:27:51. Contact: ###-####. ok temp oc only needs penetrations in corridor sealed. 12/2/2001 9:20:40 AM
FIRE-Alarm Testing4/26/20014/30/20014/30/2001PPASS
DetailsJoe Tawney
ANDY ###-#### ALRM Final OK on alarm system 4/30/2001 2:56:43 PM
FIRE-Final Inspection4/26/20014/30/20014/30/2001PPASS
DetailsJoe Tawney
FIRE FN ANDY- ###-#### Final OK for permanant occupancy 4/30/2001 2:56:18 PM
BLD-Conference4/26/20014/26/20014/26/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/26/2001 12:37:43 PM ok to stock...no public access
FIRE-Sprinkler Rough-in4/20/20014/23/20014/23/2001APART
DetailsJoe Tawney
Eric ###-#### #1049 Rough in 4/23/2001 12:16:14 PM
BLD-Other4/18/20014/19/20014/19/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/18/2001 at 11:45:16. Contact: ###-####. ceiling grid ok, except rear cooridor is required to be rated,will need all penetrations fire stoped as this is not a hallway see approved plans.contractor notified. 11/19/2001 12:07:46 PM
FIRE-Sprinkler Rough-in3/22/20013/23/20013/23/2001PPART
DetailsJoe Tawney
OK on spklr rough in for hard lid area 3/26/2001 8:25:30 AM
BLD-Framing/Rough-in3/21/20013/22/20013/22/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/21/2001 at 13:07:02. Contact: ###-####.ok to rock subject to ele,mec,plm inspections.contractor notified. 3/22/2001 12:10:25 PM
BLD-Framing/Rough-in3/19/20013/20/20013/20/2001AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/19/2001 at 13:34:42. Contact: ###-####.add framing around girders and beams in corridor. 3/20/2001 12:45:18 PM