BLD-Final | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 09:45:13. Contact: ###-####. ok for perm occ. 12/11/2001 2:17:38 PM
|
FIRE-Final Inspection | 12/10/2001 | 12/11/2001 | 12/11/2001 | A | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled 12/11/2001 9:40:19 AM
|
Permanent Occupancy | | 12/11/2001 | 12/11/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/7/2001 1:02:44 PM Fire sprinkler system finaled
|
BLD-Final | 11/1/2001 | 11/2/2001 | 11/2/2001 | P | NR |
Dave Hannah
|
|
|
Scheduled by Inspector: 425 On 11/1/2001 2:30:24 PM needs fire life safty sign off 11/2/2001 4:29:12 PM
|
BLD-Final | 10/31/2001 | 11/1/2001 | 11/1/2001 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/31/2001 at 12:32:25. Contact: ###-####.
|
FIRE-Alarm Testing | 10/31/2001 | 11/1/2001 | 11/1/2001 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection 11/2/2001 11:53:46 AM
|
FIRE-Final Inspection | 10/31/2001 | 11/1/2001 | 11/1/2001 | P | FAIL |
Troy Cobbley
|
|
|
Fire/smoke damper needs to be wired, no approved plans on site, backflow preventor on sprinkler system not operating correctly 11/2/2001 11:54:49 AM
|
BLD-Wall cover | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 15:40:34. Contact: ###-####.
|
BLD-Aging Inspection | 10/1/2001 | 10/1/2001 | 10/1/2001 | | DONE |
Dave Hannah
|
|
|
work in progress 10/1/2001 8:25:19 AM
|
BLD-Conference | 7/31/2001 | 7/31/2001 | 7/31/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 09:54:54. Contact: ###-####. draft stop on addn se corner ok to cover 7/31/2001 2:35:51 PM
|
BLD-Conference | 7/19/2001 | 7/20/2001 | 7/20/2001 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/19/2001 at 14:37:34. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/27/2001 | 6/29/2001 | 6/29/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/27/2001 at 10:54:18. Contact: ###-####. roof sheating and framing 6/29/2001 1:05:08 PM
|
BLD-Framing/Rough-in | 6/27/2001 | 6/27/2001 | 6/27/2001 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/27/2001 at 10:53:28. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/20/2001 | 6/20/2001 | 6/20/2001 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/20/2001 at 09:48:11. Contact: ###-####. shear walls and trusses on s.e. add 6/21/2001 9:21:05 AM
|
BLD-Framing/Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 09:50:43. Contact: ###-####. no time left in day 6/19/2001 4:56:50 AM
|
BLD-Conference | 6/12/2001 | 6/12/2001 | 6/12/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 06/12/2001 at 08:29:55. Contact: ###-####. 6/12/2001 1:51:50 PM
|
BLD-Foundation | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | NR |
Dave Hannah
|
|
|
gAry ###-####
|
BLD-Footing | 4/20/2001 | 4/23/2001 | 4/23/2001 | P | PART |
Dave Hannah
|
|
|
ft insp gary---- ###-#### crew is woking on footing area they wont to pour is ok 4/23/2001 2:59:42 PM
|