Covenant Presbyterian Church * To construct a 6,046 sq. ft. one story Addition for a Sancutuary which is separated with a two-hour area separation wall and a 672 sq. ft. one story addition to the existing building for restrooms, expansion of parking lot, addition of fire sprinkler system. Other work includes remodeling and upgrading existing building to V-1hr per approved plans and attachments, CUP00-00048. Fire sprinklers used for one-hour substitution
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/11/200112/11/200112/11/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/11/2001 at 09:45:13. Contact: ###-####. ok for perm occ. 12/11/2001 2:17:38 PM
FIRE-Final Inspection12/10/200112/11/200112/11/2001APASS
DetailsTroy Cobbley
Fire life/safety finaled 12/11/2001 9:40:19 AM
Permanent Occupancy 12/11/200112/11/2001 DONE
Details
FIRE-Final Inspection11/7/200111/7/200111/7/2001PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 11/7/2001 1:02:44 PM Fire sprinkler system finaled
BLD-Final11/1/200111/2/200111/2/2001PNR
DetailsDave Hannah
Scheduled by Inspector: 425 On 11/1/2001 2:30:24 PM needs fire life safty sign off 11/2/2001 4:29:12 PM
BLD-Final10/31/200111/1/200111/1/2001PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/31/2001 at 12:32:25. Contact: ###-####.
FIRE-Alarm Testing10/31/200111/1/200111/1/2001PCANC
DetailsTroy Cobbley
Duplicate inspection 11/2/2001 11:53:46 AM
FIRE-Final Inspection10/31/200111/1/200111/1/2001PFAIL
DetailsTroy Cobbley
Fire/smoke damper needs to be wired, no approved plans on site, backflow preventor on sprinkler system not operating correctly 11/2/2001 11:54:49 AM
BLD-Wall cover10/2/200110/3/200110/3/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/02/2001 at 15:40:34. Contact: ###-####.
BLD-Aging Inspection10/1/200110/1/200110/1/2001 DONE
DetailsDave Hannah
work in progress 10/1/2001 8:25:19 AM
BLD-Conference7/31/20017/31/20017/31/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/31/2001 at 09:54:54. Contact: ###-####. draft stop on addn se corner ok to cover 7/31/2001 2:35:51 PM
BLD-Conference7/19/20017/20/20017/20/2001ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/19/2001 at 14:37:34. Contact: ###-####.
BLD-Framing/Rough-in6/27/20016/29/20016/29/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/27/2001 at 10:54:18. Contact: ###-####. roof sheating and framing 6/29/2001 1:05:08 PM
BLD-Framing/Rough-in6/27/20016/27/20016/27/2001PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/27/2001 at 10:53:28. Contact: ###-####.
BLD-Framing/Rough-in6/20/20016/20/20016/20/2001PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/20/2001 at 09:48:11. Contact: ###-####. shear walls and trusses on s.e. add 6/21/2001 9:21:05 AM
BLD-Framing/Rough-in6/18/20016/19/20016/19/2001PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/18/2001 at 09:50:43. Contact: ###-####. no time left in day 6/19/2001 4:56:50 AM
BLD-Conference6/12/20016/12/20016/12/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/12/2001 at 08:29:55. Contact: ###-####. 6/12/2001 1:51:50 PM
BLD-Foundation4/30/20015/1/20015/1/2001ANR
DetailsDave Hannah
gAry ###-####
BLD-Footing4/20/20014/23/20014/23/2001PPART
DetailsDave Hannah
ft insp gary---- ###-#### crew is woking on footing area they wont to pour is ok 4/23/2001 2:59:42 PM