Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-00187
StatusFinaled
Name HUMMEL ARCHITECTS
Site Address 2785 N BOGUS BASIN RD
Project Name RASH OFFICE BUILDING
Customer Number 
ePlanReviewNo
Description
RASH, LLC - TO CONSTRUCT A 12,150 SQ. FT., TWO STORY, TYPE VN OFFICE BUILDING. OTHER WORK INCLUDES ALL SITE IMPROVEMNTS AND LANDSCAPING PER APPROVED PLANS AND ATTACHMENTS, DRH00-00156 AREA FIRST FLOOR 5,977 SQ. FT., SECOND FLOOR 6,173 SQ. FT.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/30/200112/3/200112/3/2001APASS
DetailsTony Young
walter ###-####
ok for perm. occ. as long as others are ok 12/3/2001 11:43:36 AM
Permanent Occupancy 12/3/200112/3/2001 DONE
Details
BLD-Final11/29/200111/29/200111/29/2001PFAIL
DetailsTony Young
WALTER ###-####
waiting on elevator final from the state and electrical 11/29/2001 2:15:47 PM
FIRE-Final Inspection11/27/200111/28/200111/28/2001PPASS
DetailsRick Jackson
###-####
BLD-Final11/20/200111/20/200111/19/2001PPART
DetailsTony Young
Ok for temp occ.. CN issued for temp. glass, ada compliance on ramps, special inspection final letter and other agency signoffs.
BLD-Final11/14/200111/15/200111/15/2001PFAIL
DetailsTony Young
WALTER ###-####
c/n posted 11/15/2001 4:36:14 PM
FIRE-Final Inspection11/14/200111/15/200111/15/2001APASS
DetailsRick Jackson
###-####
FIRE-Final Inspection11/15/200111/15/200111/15/2001PPART
DetailsRick Jackson
Added by Inspector: 409 On 11/15/2001 4:31:58 PM disregard the PASS on this date; temp occ approved pending fire control panel for detectors and elevator recall
FIRE-Final Inspection11/14/200111/14/200111/14/2001PFAIL
DetailsRick Jackson
Added by Inspector: 409 On 11/14/2001 4:05:41 PM elevator recall panel needed; need detector at smoke damper at stair enclosure
Code Occupancy Approval11/9/200111/8/200111/8/2001APASS
DetailsMichael Garner
Added by Inspector: MSG On 11/9/2001 11:49:33 AM
BLD-Aging Inspection11/6/200111/6/200111/6/2001 PART
DetailsTony Young
wip 11/8/2001 9:25:47 AM
BLD-Framing/Rough-in9/5/20019/6/20019/6/2001PPASS
DetailsTony Young
walter- ###-#### r/i
BLD-Energy code compliance8/28/20018/29/20018/29/2001PPART
DetailsTony Young
###-####
ok to cover main level outside walls after tightening bolts, and ok to cover main level int. non bearing walls away from any mechanical work, (no mech. permit for ducting yet) 8/29/2001 3:17:40 PM
BLD-Framing/Rough-in8/27/20018/28/20018/28/2001PPART
DetailsTony Young
###-####////c/n posted, ok to insulate unaffected areas, pending letter from eng. 8/28/2001 3:35:49 PM
BLD-Conference8/24/20018/27/20018/27/2001APASS
DetailsTony Young
for conf walter###-#### -per tony 10:00
met w/ greg w/ hummel, need structural to provide letter of compliance on as built, and talked about plan change drawings and alt. finish work, stairs, draft stopping, fire stops, etc 8/27/2001 11:03:36 AM
BLD-Framing/Rough-in8/23/20018/24/20018/24/2001PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 08/23/2001 at 17:32:14. Contact: ###-####.no mech. sign off, and need to meet arch. or strutural on job, go over special construction design 8/24/2001 2:50:35 PM
BLD-Framing/Rough-in8/20/20018/21/20018/21/2001APART
DetailsTony Young
###-#### PARTIAL
ok to drywall lid below vault area and elevator shaft and mech . room next to elevator, pending elec. sign off 8/21/2001 11:51:30 AM
BLD-Framing/Rough-in8/7/20018/8/20018/8/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 08/07/2001 at 16:50:00. Contact: ###-####. 8/8/2001 11:01:13 AM shear nialing on upper level ok to cover 8/8/2001 11:12:53 AM
BLD-Framing/Rough-in7/31/20018/1/20018/1/2001APART
DetailsTony Young
SHEAR WALL WALTER ###-####
shear ok on front areas, lower and some of upper 8/1/2001 11:32:45 AM
BLD-Concrete7/3/20017/5/20017/5/2001APART
DetailsTony Young
slab and a concrete wall Walter ###-####
poured already, s. i. was on site per walter 7/5/2001 10:51:40 AM
BLD-Foundation6/27/20016/28/20016/28/2001APART
DetailsTony Young
WAlter ###-####
pending special inspector report, already poured 6/28/2001 12:00:21 PM
BLD-Foundation6/25/20016/26/20016/26/2001PPART
DetailsTony Young
Walter ###-####
already poured, confirmed w/ mti that they where there///pending report 6/26/2001 1:20:32 PM
BLD-Foundation6/20/20016/22/20016/22/2001APART
DetailsTony Young
###-####
already poured, pending s i report 6/22/2001 10:53:56 AM
BLD-Foundation6/20/20016/21/20016/21/2001APART
DetailsTony Young
slab and vertical walls ###-####
pending s. i. report 6/21/2001 10:50:16 AM
BLD-Foundation6/14/20016/15/20016/15/2001APASS
DetailsTony Young
###-####
pending s. i. report 6/15/2001 10:12:33 AM
BLD-Footing6/8/20016/11/20016/11/2001APART
DetailsDave Hannah
###-#### 6/11/2001 10:43:46 AM MTI is testing and inspecting 6/11/2001 10:44:37 AM
BLD-Foundation6/8/20016/11/20016/11/2001APART
DetailsDave Hannah
MTI inspected and tested 6/11/2001 10:45:13 AM
BLD-Other6/9/20016/11/20016/11/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 06/09/2001 at 19:02:30. Contact: ###-####.
FIRE-Supply Line Cover6/7/20016/8/20016/8/2001ACANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/07/2001 at 14:48:16. Contact: ###-####. work code entered by caller - no fire requested 6/8/2001 7:54:32 AM
BLD-Concrete6/4/20016/5/20016/5/2001APART
DetailsTom Arcoraci
###-#### wall PENDING SPEC INSP REPORTS 6/5/2001 11:02:21 AM
BLD-Concrete5/29/20015/30/20015/30/2001APART
DetailsTony Young
###-####
pend. report from s. i. 5/30/2001 11:49:20 AM
BLD-Concrete5/23/20015/24/20015/24/2001PFAIL
DetailsTony Young
concrete wall walter ###-####
rebar above windows not per plan, pending s. i. report on fix 5/24/2001 1:47:50 PM
BLD-Concrete5/17/20015/18/20015/18/2001APART
DetailsTony Young
pouring at 8:00 Walter ###-####
pending s. i. report 5/18/2001 9:13:19 AM
BLD-Concrete5/11/20015/14/20015/14/2001APART
DetailsTony Young
###-#### wall
upper south retaining wall, ok pending s. i. report 5/14/2001 1:32:51 PM
BLD-Concrete5/7/20015/8/20015/8/2001PPART
DetailsTony Young
pouring at 12:00 Walter ###-####
pending s.i. report 5/8/2001 1:58:30 PM
BLD-Concrete5/7/20015/8/20015/8/2001APART
DetailsTony Young
found. wall on top of retaining wall north 1/2, and found. wall around dumpster ok pending S. I. report 5/8/2001 10:49:24 AM
BLD-Foundation5/2/20015/3/20015/3/2001APART
DetailsTony Young
found-- walter- ###-####
looks ok, w/ verbal corrections, pending s. i. report 5/3/2001 10:34:37 AM
BLD-Concrete4/19/20014/19/20014/19/2001PPART
DetailsTony Young
special inspectors on site walter ###-####
BLD-Concrete4/13/20014/16/20014/16/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 04/13/2001 at 14:02:38. Contact: ###-####.
Special on site, ftgs for dumpster area, and retaining wall 2nd half 4/16/2001 12:09:53 PM
BLD-Footing4/11/20014/12/20014/12/2001APART
DetailsTony Young
special inspector on site Walter ###-#### pouring at 10:30
pending s. i. report, retaining wall ftgs 4/12/2001 10:41:04 AM
BLD-Concrete4/5/20014/5/20014/5/2001PPART
DetailsTony Young
walter-- ###-#### concrete
wall rebar inspection while panels are off, looks good so far, pending s. i. report 4/5/2001 3:12:04 PM
BLD-Footing4/3/20014/3/20014/3/2001PPART
DetailsTony Young
pending s.i. report 4/3/2001 2:16:57 PM
BLD-Footing3/27/20013/28/20013/28/2001APART
DetailsTony Young
work in progress, talked w/ S. I. about corrections that need to be addressed also t/w job foreman. 1/2 of footing were poured when I got here and some corrections where not done yet, s.i. and I talked, corrections are being made now, general conformance should be met 3/28/2001 11:44:00 AM
BLD-Grading Inspection3/28/20013/28/20013/28/2001 PASS
DetailsRita DeYoung
Footing subgrade has been approved by the geotechnical engineer.
BLD-Footing3/27/20013/27/20013/27/2001PPART
DetailsTony Young
###-#### late pm
pending special inspector report, work in progress, verbal corrections, need to go back and verify 3/27/2001 2:56:30 PM