Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-00220
StatusFinaled
Name FURNITURE ROW
Site Address 101 N COLE RD
Project NameFURNITURE ROW
Customer Number 
ePlanReviewNo
Description
FURNITURE ROW * To construct a 27,296 square foot, one story, Type VN Unlimited area, fully fire sprinklered shell only addition and remodel the existing 27,662 square foot building as a fully fire sprinklered shell. The intended uses in the building are for three separate Group M Occupancy tenants. Grading and drainage for addition and parking lot under separate permit.DRH01-00001, PC#0079-01 MLO 60 foot open yards must be maintained around this building to comply with unlimited area requirements. Fire sprinklers used for unlimited area. No occupancy of any of the tenant spaces is authorized under this shell permit. Separate plans and permits for tenant improvements are required for each tenant space. MLO
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/11/20021/11/20021/11/2002PPASS
DetailsRuss Owen
Scheduled by Inspector: 407 On 1/11/2002 1:50:47 PM Ok perm oc. cards delivered tto store this day.1/11/2002 1:57:14 PM 1/11/2002 2:02:09 PM
FIRE-Final Inspection1/15/200211/18/200111/18/2001PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 1/15/2002 12:26:58 PM Fire life/safety finaled
BLD-Final11/9/200111/9/200111/9/2001AFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 11/9/2001 1:59:46 PM . Needs Fire/Life Safety, Zoning, ACHD . And non- compliance items on final special inspection report approved by the project engineer. See permit #bld01-02385 for Denver mattres Tennant improvement. 11/9/2001 2:05:19 PM
BLD-Final11/9/200111/9/200111/9/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 11/9/2001 4:01:08 PM ok temp oc , see am inspection history for addn info. 11/9/2001 4:20:33 PM
BLD-Final11/5/200111/6/200111/6/2001ANR
DetailsRuss Owen
###-#### ELDEN NEEDS TEMP OCCUPANCY
BLD-Framing/Rough-in9/19/20019/20/20019/20/2001APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 09/19/2001 at 11:44:04. Contact: ###-####. ok to cover baths in center and west bld 9/20/2001 9:43:55 AM
BLD-Framing/Rough-in8/28/20018/28/20018/28/2001PPART
DetailsRuss Owen
craig-- ###-####--fr insp ok to cover areas with-out plumbing. 8/28/2001 5:08:16 PM
BLD-Conference8/20/20018/20/20018/20/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/20/2001 3:53:30 PM
BLD-Framing/Rough-in8/10/20018/10/20018/10/2001PPART
DetailsRuss Owen
FR INSP- DIRK - ###-#### . NOTE:needs a tennant improvement permit, schell only. 8/13/2001 12:21:49 PM
BLD-Foundation6/27/20016/27/20016/27/2001PPART
DetailsRuss Owen
###-#### subject to si. 6/27/2001 3:24:21 PM
BLD-Footing6/25/20016/26/20016/26/2001APART
DetailsRuss Owen
corey ###-#### special inspection reports on site. 6/26/2001 11:56:16 AM
BLD-Concrete6/14/20016/15/20016/15/2001APART
DetailsRuss Owen
###-#### subject to s-i. 1/15/2002 4:06:29 PM
BLD-Foundation6/13/20016/14/20016/14/2001APART
DetailsRuss Owen
stem wall eric ###-#### ok subject to special insp. 1/14/2002 12:27:25 PM
BLD-Foundation6/13/20016/13/20016/13/2001PPART
DetailsRuss Owen
corey ###-####
BLD-Foundation6/11/20016/11/20016/11/2001PPASS
DetailsDave Hannah
corey ###-#### MTI on site testing and inspecting 6/11/2001 1:50:12 PM
BLD-Footing6/7/20016/8/20016/8/2001APART
DetailsRuss Owen
pour at 10:30= cory ###-#### subject to s-i. 1/8/2002 4:01:02 PM
BLD-Footing6/6/20016/6/20016/6/2001PPART
DetailsRuss Owen
cory ###-#### s-i required insp. 1/6/2002 5:14:33 PM
BLD-Footing6/1/20016/1/20016/1/2001PPART
DetailsRuss Owen
pouring at 1:00 corey ###-#### subject to ,mti inspection. 1/4/2002 9:38:09 AM
BLD-Footing5/30/20015/30/20015/30/2001PPART
DetailsRuss Owen
pouring at 2 ###-#### final pour footings. 12/30/2001 4:31:21 PM
BLD-Framing/Rough-in5/30/20015/30/20015/30/2001PPART
DetailsRuss Owen
fr insp --dirk ###-#### interior non bearing walls and east to west tall walls ok to cover. 12/30/2001 4:31:00 PM
BLD-Foundation5/29/20015/29/20015/29/2001PPART
DetailsRuss Owen
###-#### inspection will be performed by mti. 12/30/2001 10:11:57 AM
BLD-Footing5/24/20015/24/20015/24/2001PPART
DetailsJim Storey
###-#### pour 3:30 pending rfi's and special insp report bach time on waiting truck in qustion. 5/24/2001 4:14:11 PM
BLD-Footing5/22/20015/22/20015/22/2001PPART
DetailsRuss Owen
Cory ###-#### north and east footing ok also inspections by special inspector required for design also cmu wall above went over requirements with contractor. MTI will be contracted. 12/22/2001 2:51:07 PM