BLD-Final | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | PART |
Jim Storey
|
|
|
Tim ###-#### need public work sign off. final ok upon that resolve/ 7/6/2001 1:56:50 PM
|
Permanent Occupancy | | 7/6/2001 | 7/6/2001 | | DONE |
|
|
|
|
Permanent Occupancy | | 7/6/2001 | 7/6/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/5/2001 | 7/5/2001 | 7/5/2001 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 7/5/2001 3:20:40 PM awaiting completion of removal of existing strobe
|
BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 | A | PART |
Dave Hannah
|
|
|
ceiling grid tim ###-#### need to ad seismic pods the rest is ok 6/12/2001 11:58:17 AM
|
BLD-Framing/Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 | P | PART |
Carl Dependahl
|
|
|
Tim ###-####, ok to cover walls & hard lid at restroom...recall for grid insp at west side areas when ready 5/17/2001 1:49:02 PM
|
BLD-Framing/Rough-in | 5/16/2001 | 5/16/2001 | 5/16/2001 | P | FAIL |
Carl Dependahl
|
|
|
fr insp tim --###-#### patch 1hr lid, wrap beam, firestop penetrations; ok to begin walls, recall before install of gyp lids 5/16/2001 5:15:15 PM
|
FIRE-Sprinkler Rough-in | 5/14/2001 | 5/14/2001 | 5/14/2001 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 5/14/2001 8:49:28 AM okay to cover - verify combustibles covered in bathrooms at final
|
BLD-Framing/Rough-in | 5/2/2001 | 5/4/2001 | 5/4/2001 | A | PART |
Carl Dependahl
|
|
|
TIM ###-####, beam at new opening in west wall ok...reinstall 1hr lid as needed (patch) 5/4/2001 11:32:48 AM
|