BLD-Final | 11/15/2001 | 11/16/2001 | 11/16/2001 | A | PART |
Tom Arcoraci
|
|
|
fn insp-- jerry ###-#### ok for perm occ when others sign perm occ 11/16/2001 8:48:25 AM
|
FIRE-Final Inspection | 11/14/2001 | 11/15/2001 | 11/15/2001 | P | PASS |
Troy Cobbley
|
|
|
Fire/life safety, fire sprinkler and fire alarm OK. Ok for perm occ 11/15/2001 2:02:19 PM
|
FIRE-Final Inspection | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | PASS |
Troy Cobbley
|
|
|
Fire/lifesafety finaled 11/14/2001 12:48:45 PM
|
FIRE-Final Inspection | 11/5/2001 | 11/6/2001 | 11/6/2001 | A | NR |
Troy Cobbley
|
|
|
Had conference with superintendant on requirements for the life/safety inspection 11/6/2001 11:21:51 AM
|
BLD-Framing/Rough-in | 10/9/2001 | 10/10/2001 | 10/10/2001 | A | PASS |
Tom Arcoraci
|
|
|
###-#### grid ok 10/10/2001 10:50:49 AM
|
BLD-Framing/Rough-in | 8/21/2001 | 8/22/2001 | 8/22/2001 | A | PART |
Russ Owen
|
|
|
jerry ###-####. ok to sheetrock interior walls , pending plumbing approval. 8/22/2001 10:37:38 AM
|
BLD-Framing/Rough-in | 6/25/2001 | 6/26/2001 | 6/26/2001 | A | PART |
Russ Owen
|
|
|
jerry -###-#### r/i for roof ,deck welds ok ,also special inspection will be performed. 6/26/2001 10:23:17 AM
|
BLD-Framing/Rough-in | 5/23/2001 | 5/24/2001 | 5/24/2001 | P | PART |
Dave Hannah
|
|
|
wall MTI on site checking rebar inspector was using rebar shop drwgs not city approve struc. I found diff in tow inspector will go back over tilt up pannels with struc set 5/24/2001 3:08:08 PM
|
BLD-Footing | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PART |
Russ Owen
|
|
|
###-#### int columns. 12/8/2001 10:03:54 AM
|
BLD-Footing | 5/4/2001 | 5/7/2001 | 5/7/2001 | A | PASS |
Russ Owen
|
|
|
###-#### ok ext footings,also insp will be performed by MTI. 12/7/2001 10:48:44 AM
|