BLD-Final | 6/22/2001 | 6/22/2001 | 6/22/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 06/22/2001 at 07:17:54. Contact: ###-####. lc issued 6/21/2001 9:22:59 PM
|
BLD-Aging Inspection | 6/12/2001 | 6/12/2001 | 6/12/2001 | | PASS |
Tom Arcoraci
|
|
|
wip 6/12/2001 8:08:36 PM
|
BLD-Energy code compliance | 4/12/2001 | 4/12/2001 | 4/12/2001 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 4/12/2001 10:43:47 AM
|
BLD-Framing/Rough-in | 4/11/2001 | 4/12/2001 | 4/12/2001 | A | PASS |
Tom Arcoraci
|
|
|
Clive ###-####
|
BLD-Framing/Rough-in | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | FAIL |
Tom Arcoraci
|
|
|
###-####- george fr cn issued 4/9/2001 3:01:04 PM
|
BLD-Framing/Rough-in | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | NR |
Russ Owen
|
|
|
clive ###-####. needs plm and ele prior also permit for gas log as taged on the unit ,left c/n posted to recall do not cover. 4/3/2001 3:09:17 PM 4/3/2001 3:11:49 PM 4/3/2001 4:01:06 PM
|
BLD-Framing/Rough-in | 3/28/2001 | 3/28/2001 | 3/28/2001 | P | PART |
Tom Arcoraci
|
|
|
shear ###-#### ok to side 3/28/2001 3:18:12 PM
|
BLD-Framing/Rough-in | 3/27/2001 | 3/27/2001 | 3/27/2001 | P | FAIL |
Dave Hannah
|
|
|
shear insp Clyde ###-#### shear panels not nailed per eng 3/27/2001 2:21:05 PM
|
BLD-Foundation | 3/8/2001 | 3/8/2001 | 3/8/2001 | P | PART |
Tom Arcoraci
|
|
|
wall\\###-####
|
BLD-Footing | 3/2/2001 | 3/5/2001 | 3/5/2001 | A | PASS |
Tom Arcoraci
|
|
|
LATE AM ###-####
|