BLD-Final | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 6/19/2001 2:54:50 AM lc issued
|
BLD-Final | 6/18/2001 | 6/18/2001 | 6/18/2001 | P | FAIL |
Russ Owen
|
|
|
Final reinspect - Clive, ###-#### 2nd c/n posted for crawl space insulation and vappor coverage,as crawl not accessable at first inspection, also as written complete final grade. 1/18/2002 2:51:00 PM
|
FIRE-Final Inspection | 6/18/2001 | 6/18/2001 | 6/18/2001 | A | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 06:17:23. Contact: ###-####. Cancel Should be structural insp 6/18/2001 8:33:59 AM
|
BLD-Final | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | FAIL |
Tom Arcoraci
|
|
|
key is in ele outlet outside front door ###-#### c/notice posted 6/13/2001 10:11:00 PM
|
BLD-Aging Inspection | 6/12/2001 | 6/12/2001 | 6/12/2001 | | PASS |
Tom Arcoraci
|
|
|
wip 6/12/2001 8:08:43 PM
|
BLD-Energy code compliance | 4/12/2001 | 4/12/2001 | 4/12/2001 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 4/12/2001 10:40:22 AM
|
BLD-Framing/Rough-in | 4/11/2001 | 4/12/2001 | 4/12/2001 | A | PASS |
Tom Arcoraci
|
|
|
Clive ###-####
|
BLD-Framing/Rough-in | 4/9/2001 | 4/9/2001 | 4/9/2001 | P | FAIL |
Tom Arcoraci
|
|
|
george-- ###-#### cn issued 4/9/2001 5:34:30 PM
|
BLD-Framing/Rough-in | 4/3/2001 | 4/3/2001 | 4/3/2001 | P | NR |
Russ Owen
|
|
|
clive-- ###-#### fr need to resolve prior c/n for hold down installations c/n still posted, also obtain a permit and inspection for the fire place,new c/n posted do not cover recall. 4/3/2001 4:05:04 PM 4/3/2001 4:05:40 PM
|
BLD-Framing/Rough-in | 3/19/2001 | 3/19/2001 | 3/19/2001 | P | FAIL |
Tom Arcoraci
|
|
|
shear nail-- ###-#### pat cn posted 3/19/2001 3:29:48 PM
|
BLD-Foundation | 3/6/2001 | 3/6/2001 | 3/6/2001 | P | PART |
Tom Arcoraci
|
|
|
wall insp Dave Cox ###-#### wip ok 3/6/2001 2:34:47 PM
|
BLD-Footing | 3/2/2001 | 3/5/2001 | 3/5/2001 | A | PASS |
Tom Arcoraci
|
|
|
|