Permanent Occupancy | | 3/18/2004 | 3/18/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 8/21/2003 | 8/21/2003 | 8/21/2003 | | CANC |
Russ Owen
|
|
|
|
BLD-Final | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | FAIL |
Russ Owen
|
|
|
###-####. c/n posted. 5/24/2002 11:28:56 AM
|
BLD-Final | 5/24/2002 | 5/24/2002 | 5/24/2002 | P | PASS |
Russ Owen
|
|
|
###-#### DARWIN ok perm oc. 5/24/2002 4:00:05 PM
|
BLD-Final | 5/13/2002 | 5/13/2002 | 5/13/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/13/2002 11:24:18 AM Posted c/n. 5/13/2002 3:05:33 PM
|
BLD-Final | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/13/2002 2:46:06 PM. Went back to check addnl item and left c/n next to exting c/n. Told person working to let Darwin know when he returns. As I do not have his number. 5/13/2002 3:08:05 PM
|
BLD-Final | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | CANC |
Russ Owen
|
|
|
fn occ- ###-####- darwin or janet Unable to do before 5 pm. 5/13/2002 11:26:30 AM
|
FIRE-Final Inspection | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety ok. structural inspector to verify the rest of the door hardware was changed out 5/10/2002 3:52:12 PM
|
FIRE-Final Inspection | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | FAIL |
Troy Cobbley
|
|
|
change door hardware to ADA approved type (lever - same for locks if equiped), remove thumbturns on exit doors, place sticker on main door if it becomes keyed, provide fire extinguisher with current inspection tag, provide exit sign in basement per approved plans 5/2/2002 4:29:35 PM
|
BLD-Final | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | CANC |
Russ Owen
|
|
|
fn occ darwin- or janet- ###-#### or ###-#### . Called and talkede with darwin, Told him that he would need all required signatures on card, before calling for structural final. 5/1/2002 2:56:11 PM
|
BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 | A | PASS |
Russ Owen
|
|
|
###-####. Ok to sheetrock all of building. 1/30/2002 12:25:55 PM
|
BLD-Conference | 1/29/2002 | 1/29/2002 | 1/29/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 1/29/2002 1:36:38 PM stoped by. as i had anticipated another inspection by now noted interior shear walls not done correct. Will need to recall. 1/29/2002 1:40:43 PM
|
BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### This is not a final . It is frame insp of the interior shear wall that has been part covered , I stoped by and talked with the person doing the work, told them to call for a pm inspection . So that I could again explain how to construct shear walls./2002 9:16:45 AM 1/30/2002 9:19:03 AM
|
BLD-Framing/Rough-in | 1/18/2002 | 1/18/2002 | 1/18/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 1/18/2002 10:38:54 AM Corrections made, Talked with engineer on phone front wall has window removed and hd added and now ok rear wall has smaller windows and no ok interior shear wall will still need to have hd bolts thru studs replaced with 3/4" and osb added to one side. not talked with Zack this day noted the above and also to recall after 1st layer of sheet rock has been added. NOTE. City ordinance will allow the garage to be as is as per location of property line see permit. 1/18/2002 10:47:34 AM
|
BLD-Final | 1/16/2002 | 1/17/2002 | 1/17/2002 | A | PART |
Russ Owen
|
|
|
ZACK ###-#### talked with zack insulation will be completed and recall when done. 1/17/2002 1:00:14 PM
|
BLD-Final | 1/14/2002 | 1/16/2002 | 1/16/2002 | A | CANC |
Russ Owen
|
|
|
ZACH ###-####
|
BLD-Framing/Rough-in | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | CANC |
Russ Owen
|
|
|
fr insp-- zach ###-####
|
BLD-Final | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PART |
Russ Owen
|
|
|
###-#### Went over items again was trying to have suppervisor here this day , but could not. 1/15/2002 5:06:16 PM
|
BLD-Final | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | PART |
Russ Owen
|
|
|
###-####. contractor not at side called and went over mics items that still need to be addressed,will recall again soon. 1/11/2002 9:51:40 AM
|
BLD-Framing/Rough-in | 1/7/2002 | 1/8/2002 | 1/8/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 1/7/2002 5:36:36 PM posted c/n. 1/8/2002 1:05:30 PM
|
BLD-Final | 1/3/2002 | 1/4/2002 | 1/4/2002 | P | PART |
Russ Owen
|
|
|
went over items will be back 1/7/02 for another inspection and will leave c/n . 1/4/2002 4:49:09 PM
|
BLD-Final | 1/3/2002 | 1/3/2002 | 1/3/2002 | P | CANC |
Russ Owen
|
|
|
|
BLD-Conference | 12/10/2001 | 12/10/2001 | 12/10/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 12/10/2001 10:28:28 AM . went over requirements with framer and hvac company, note: It was fund today that the drywall has not been applied to the fire resistive exterior walls. and they now have been sided. 12/10/2001 10:41:05 AM
|
BLD-Conference | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 11/29/2001 4:20:02 PM . went over requirements with cont/architect. c/n posted .pre-insp only. 11/29/2001 4:31:22 PM
|
BLD-Framing/Rough-in | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | PART |
Russ Owen
|
|
|
###-#### message zack please call one hour berfore going site
|
BLD-Framing/Rough-in | 11/27/2001 | 11/28/2001 | 11/28/2001 | A | NR |
Russ Owen
|
|
|
###-#### darwin. needs mec and ele insp 11/28/2001 12:00:14 PM
|
BLD-Framing/Rough-in | 9/21/2001 | 9/21/2001 | 9/21/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/21/2001 at 11:13:55. Contact: ###-####. ok to rock required ext walls 9/21/2001 4:01:19 PM
|
BLD-Aging Inspection | 9/3/2001 | 9/3/2001 | 9/3/2001 | | PART |
Russ Owen
|
|
|
wip. 9/5/2001 11:05:04 AM
|
BLD-Foundation | 7/3/2001 | 7/3/2001 | 7/3/2001 | P | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 7/2/2001 | 7/2/2001 | 7/2/2001 | P | PART |
Russ Owen
|
|
|
###-####
|