BLD-Final | 2/11/2002 | 2/12/2002 | 2/12/2002 | P | DONE |
Tom Arcoraci
|
|
|
###-####
|
BLD-Final | 2/12/2002 | 2/12/2002 | 2/12/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 2/12/2002 9:52:02 AM ok for perm occ 2/12/2002 9:56:24 AM
|
BLD-Grading Inspection | 2/12/2002 | 2/12/2002 | 2/12/2002 | A | CANC |
Rita DeYoung
|
|
|
Scheduled by Inspector: 408 On 2/12/2002 9:48:04 AM
|
BLD-Final | 1/15/2002 | 1/17/2002 | 1/17/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### install bathroom partations and signage need final letter from spec inspection service and eng for welding instead of bolts at radius ok for temp occ 1/17/2002 2:17:20 PM 1/17/2002 2:18:11 PM 1/17/2002 2:18:46 PM
|
FIRE-Final Inspection | 1/17/2002 | 1/17/2002 | 1/17/2002 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 1/17/2002 2:03:45 PM Fire life/safety, fire alarm and fire sprinkler system finaled.
|
FIRE-Final Inspection | 1/15/2002 | 1/17/2002 | 1/17/2002 | A | CANC |
Troy Cobbley
|
|
|
canceled by contractor 1/17/2002 9:14:42 AM
|
Code Occupancy Approval | 1/4/2002 | 1/4/2002 | 1/4/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
Scheduled by Inspector: WMM On 1/4/2002 12:23:41 PM
|
BLD-Framing/Rough-in | 11/29/2001 | 11/29/2001 | 11/29/2001 | P | NR |
Tom Arcoraci
|
|
|
CELING GRID ON 1/2 OF BUILDING
|
BLD-Concrete | 10/15/2001 | 10/16/2001 | 10/16/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/15/2001 at 11:08:33. Contact: ###-####. ok to grout 10/16/2001 9:28:22 AM
|
BLD-Framing/Rough-in | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 09:44:13. Contact: ###-####. shear nailing ok grout pour ok wip 10/3/2001 10:26:17 AM
|
BLD-Other | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 08:03:59. Contact: ###-####. wip ok 9/24/2001 2:31:12 PM
|
BLD-Wall cover | 9/19/2001 | 9/19/2001 | 9/19/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/19/2001 at 07:22:39. Contact: ###-####. slip joint installed at roof deck and fire block installed 9/19/2001 2:43:20 PM
|
BLD-Wall cover | 9/17/2001 | 9/18/2001 | 9/18/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 15:00:35. Contact: ###-####. shear ok partial 9/17/2001 10:51:11 PM
|
BLD-Wall cover | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 07:55:11. Contact: ###-####. no one at site 9/12/2001 4:30:43 AM
|
BLD-Wall cover | 9/6/2001 | 9/7/2001 | 9/7/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/06/2001 at 14:18:21. Contact: ###-####.north wall partial inspection of ext only screws ok to proceed. 9/7/2001 12:19:54 PM
|
BLD-Wall cover | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 07:59:25. Contact: ###-####. wip 8/30/2001 2:58:09 AM
|
BLD-Conference | 8/28/2001 | 8/28/2001 | 8/28/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/28/2001 at 08:58:57. Contact: ###-####. NEEDS 8/28/2001 2:45:31 AM
|
BLD-Other | 8/20/2001 | 8/20/2001 | 8/20/2001 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/20/2001 at 08:43:40. Contact: ###-####. grout 8/20/2001 1:44:11 AM
|
BLD-Other | 8/15/2001 | 8/15/2001 | 8/15/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/15/2001 at 06:54:35. Contact: ###-####. col ok for grout pour 8/14/2001 9:24:45 PM
|
BLD-Footing | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/02/2001 at 14:51:53. Contact: ###-####.
|
BLD-Footing | 8/1/2001 | 8/2/2001 | 8/2/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 14:01:19. Contact: ###-####.
|
BLD-Footing | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 12:46:32. Contact: ###-####.
|
BLD-Footing | 7/30/2001 | 7/30/2001 | 7/30/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/30/2001 at 08:27:08. Contact: ###-####. int footing. 7/30/2001 3:54:38 PM
|
BLD-Footing | 7/25/2001 | 7/26/2001 | 7/26/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/25/2001 at 15:11:12. Contact: ###-####.
|
BLD-Foundation | 7/25/2001 | 7/26/2001 | 7/26/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/25/2001 at 15:13:49. Contact: ###-####.
|
BLD-Footing | 7/20/2001 | 7/23/2001 | 7/23/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/20/2001 at 13:58:49. Contact: ###-####.
|
BLD-Foundation | 7/20/2001 | 7/23/2001 | 7/23/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/20/2001 at 13:59:37. Contact: ###-####.
|
BLD-Footing | 7/19/2001 | 7/19/2001 | 7/19/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/19/2001 at 09:26:52. Contact: ###-####. west angle footing 7/19/2001 4:25:43 AM
|
BLD-Footing | 7/17/2001 | 7/18/2001 | 7/18/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 07/17/2001 at 11:58:50. Contact: ###-####. north side of building ftgs ok 7/18/2001 10:14:01 AM
|
BLD-Conference | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/09/2001 at 11:16:10. Contact: ###-####. pre job conf 7/9/2001 9:18:10 PM
|