BLD-Final | 6/20/2001 | 6/21/2001 | 6/21/2001 | A | PASS |
Russ Owen
|
|
|
brian ###-#### ok perm oc. 1/21/2002 11:40:20 AM
|
BLD-Final | 1/21/2002 | 6/21/2001 | 6/21/2001 | A | PASS |
Russ Owen
|
|
|
Added by Inspector: 407 On 1/21/2002 11:40:02 AM ok perem oc. 1/21/2002 11:40:28 AM
|
FIRE-Final Inspection | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PASS |
Joe Tawney
|
|
|
Reinsp OK for permanant occupancy 6/20/2001 1:14:39 PM
|
Permanent Occupancy | | 6/20/2001 | 6/20/2001 | | DONE |
|
|
|
|
BLD-Final | 6/15/2001 | 6/15/2001 | 6/15/2001 | P | FAIL |
Russ Owen
|
|
|
brian-- ###-#### needs zoning and fire/life saftey also washers required behind the steel screws attaching the metal cable tray fire stop face plates in the battery room. 1/15/2002 2:20:15 PM
|
BLD-Final | 6/15/2001 | 6/15/2001 | 6/15/2001 | A | FAIL |
Joe Tawney
|
|
|
Added by Inspector: 406 On 6/15/2001 10:50:37 AM Reinsp Fail Alarm and spklr permits
|
FIRE-Final Inspection | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 6/13/2001 11:46:41 AM
|
FIRE-Final Inspection | 6/11/2001 | 6/12/2001 | 6/12/2001 | A | FAIL |
Joe Tawney
|
|
|
###-#### Exit and emerg lights OK All other to be done later 6/12/2001 6:17:09 PM
|
FIRE-Conference | 6/4/2001 | 6/4/2001 | 6/4/2001 | P | PASS |
Joe Tawney
|
|
|
Conf with Bryan ,contr regarding alarm and preaction sysyems 6/4/2001 2:17:01 PM . 6/4/2001 2:17:05 PM
|
BLD-Framing/Rough-in | 4/25/2001 | 4/26/2001 | 4/26/2001 | A | FAIL |
Dave Hannah
|
|
|
ceiling ###-#### every thing ok but for riviting around perm 4/26/2001 10:54:27 AM
|
BLD-Framing/Rough-in | 4/11/2001 | 4/12/2001 | 4/12/2001 | A | PART |
Russ Owen
|
|
|
fr insp brian ###-#### ok to cover core board. 4/12/2001 12:01:11 PM
|
BLD-Framing/Rough-in | 4/9/2001 | 4/10/2001 | 4/10/2001 | A | PART |
Russ Owen
|
|
|
fr insp brian- ###-#### need approval for ceiling joist, need to remove and replace all non fire retardant wood. 4/10/2001 11:43:13 AMc/n posted. 4/10/2001 11:43:23 AM
|
BLD-Framing/Rough-in | 4/5/2001 | 4/6/2001 | 4/6/2001 | A | FAIL |
Russ Owen
|
|
|
###-#### no approved plans,on site work started with out permits no inspections done by ele,mec,plm talked Brian job cont,told him to get plans and recall insp. 4/6/2001 10:27:52 AM 4/6/2001 10:29:08 AM
|
BLD-Framing/Rough-in | 4/6/2001 | 4/6/2001 | 4/6/2001 | P | FAIL |
Russ Owen
|
|
|
###-####. Went out to reveiw approved plans , all areas have been sheetrocked on 1 side and ceilings also rocked, right rear area requires a 1 hour wall separation and a 2 hour ceiling, for containment of stored battery ,the ceiling joist are not per plan also listed assembly requires laminating compoud at the 3 sheetrock layers, The first layer has been painted with a textured seal coating, which will affect the system, 2nd layer has been applied by screws only, advised contractor to contact the architect and engineer. Also note there has not been any electrical,plumbing or mechanical inspections done at this time.. 4/6/2001 4:44:57 PM 4/6/2001 4:45:26 PM 4/6/2001 4:45:48 PM 4/6/2001 4:48:39 PM
|