Permit Information
Permit NumberBLD01-00369
StatusFinaled
Name CRICKET COMMUNICATIONS
Site Address 10215 W EMERALD ST
Project NameEMERALD RESEARCH (C)
Customer Number 
ePlanReviewNo
Description
To construct a a 6808 sq.ft. office with telephone switch room/shipping & receiving room/transmission room/power room, and exterior 19' x 25' exterior 8 ft. high chain link fence to contain glycol dry cooler units and a emergency power unit with above ground fuel tank per approved plans on file. Interior work to include, construction of a one-hour tenant demising wall, a one-hour occupancy separation wall and ceiling for required separation of battery room, construction of noncombustible partitions to create switching room, transmition room, shipping and receiving area, small conference room, control room, and office areas, there will be a 3,380 sq ft adminstrative office l9ocated at the front that will remain unfinished a separate permit will be required to finish this area, installation of new exterior door and landing, the installation of suspended ceiling tiles and gypboard ceilings, concrete pad for emergency generator and glycol coolers. Miscelaneous related interior finishes NOTE: This building is fully fire sprinklered for area increase, all modifications and alterations to the fire sprinkler system is required to be in compliance with NFPA #13 as regulated by the fire department. P.C.#0130-01)*rmh*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/20/20016/21/20016/21/2001APASS
DetailsRuss Owen
brian ###-#### ok perm oc. 1/21/2002 11:40:20 AM
BLD-Final1/21/20026/21/20016/21/2001APASS
DetailsRuss Owen
Added by Inspector: 407 On 1/21/2002 11:40:02 AM ok perem oc. 1/21/2002 11:40:28 AM
FIRE-Final Inspection6/19/20016/20/20016/20/2001APASS
DetailsJoe Tawney
Reinsp OK for permanant occupancy 6/20/2001 1:14:39 PM
Permanent Occupancy 6/20/20016/20/2001 DONE
Details
BLD-Final6/15/20016/15/20016/15/2001PFAIL
DetailsRuss Owen
brian-- ###-#### needs zoning and fire/life saftey also washers required behind the steel screws attaching the metal cable tray fire stop face plates in the battery room. 1/15/2002 2:20:15 PM
BLD-Final6/15/20016/15/20016/15/2001AFAIL
DetailsJoe Tawney
Added by Inspector: 406 On 6/15/2001 10:50:37 AM Reinsp Fail Alarm and spklr permits
FIRE-Final Inspection6/12/20016/13/20016/13/2001AFAIL
DetailsJoe Tawney
###-#### Final Fail C/N issued 6/13/2001 11:46:41 AM
FIRE-Final Inspection6/11/20016/12/20016/12/2001AFAIL
DetailsJoe Tawney
###-#### Exit and emerg lights OK All other to be done later 6/12/2001 6:17:09 PM
FIRE-Conference6/4/20016/4/20016/4/2001PPASS
DetailsJoe Tawney
Conf with Bryan ,contr regarding alarm and preaction sysyems 6/4/2001 2:17:01 PM . 6/4/2001 2:17:05 PM
BLD-Framing/Rough-in4/25/20014/26/20014/26/2001AFAIL
DetailsDave Hannah
ceiling ###-#### every thing ok but for riviting around perm 4/26/2001 10:54:27 AM
BLD-Framing/Rough-in4/11/20014/12/20014/12/2001APART
DetailsRuss Owen
fr insp brian ###-#### ok to cover core board. 4/12/2001 12:01:11 PM
BLD-Framing/Rough-in4/9/20014/10/20014/10/2001APART
DetailsRuss Owen
fr insp brian- ###-#### need approval for ceiling joist, need to remove and replace all non fire retardant wood. 4/10/2001 11:43:13 AMc/n posted. 4/10/2001 11:43:23 AM
BLD-Framing/Rough-in4/5/20014/6/20014/6/2001AFAIL
DetailsRuss Owen
###-#### no approved plans,on site work started with out permits no inspections done by ele,mec,plm talked Brian job cont,told him to get plans and recall insp. 4/6/2001 10:27:52 AM 4/6/2001 10:29:08 AM
BLD-Framing/Rough-in4/6/20014/6/20014/6/2001PFAIL
DetailsRuss Owen
###-####. Went out to reveiw approved plans , all areas have been sheetrocked on 1 side and ceilings also rocked, right rear area requires a 1 hour wall separation and a 2 hour ceiling, for containment of stored battery ,the ceiling joist are not per plan also listed assembly requires laminating compoud at the 3 sheetrock layers, The first layer has been painted with a textured seal coating, which will affect the system, 2nd layer has been applied by screws only, advised contractor to contact the architect and engineer. Also note there has not been any electrical,plumbing or mechanical inspections done at this time.. 4/6/2001 4:44:57 PM 4/6/2001 4:45:26 PM 4/6/2001 4:45:48 PM 4/6/2001 4:48:39 PM