BLD-Final | 3/11/2003 | 3/12/2003 | 3/12/2003 | A | PASS |
Tom Arcoraci
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Conference | 1/17/2003 | 1/21/2003 | 1/21/2003 | A | PASS |
Tom Arcoraci
|
|
|
work still in progress--ok per tom
|
BLD-Conference | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### after 9am gaurd rail not reqired at drive way
12/18/2002 10:10:07 AM
|
BLD-Conference | 9/30/2002 | 9/30/2002 | 9/30/2002 | P | PASS |
Carl Dependahl
|
|
|
needs to extend permit got post card mailed...large project, WIP. 9/30/2002 1:59:37 PM
|
BLD-Energy code compliance | 3/15/2002 | 3/15/2002 | 3/15/2002 | P | PART |
Carl Dependahl
|
|
|
###-#### Chris call to meet there ... ok per 408 3/15/2002 3:53:34 PM
|
BLD-Energy code compliance | 3/13/2002 | 3/13/2002 | 3/13/2002 | P | NR |
Dave Hannah
|
|
|
###-#### CHRIS
|
BLD-Conference | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 3/5/2002 1:50:25 PM w/ bldr, sent insp to 408 3/5/2002 2:50:45 PM
|
BLD-Framing/Rough-in | 3/4/2002 | 3/5/2002 | 3/5/2002 | P | PASS |
Tom Arcoraci
|
|
|
fr chris ###-####
|
BLD-Conference | 2/19/2002 | 2/20/2002 | 2/20/2002 | A | PASS |
Carl Dependahl
|
|
|
for conf chris ###-#### install smoke dets per 310.9 2/21/2002 9:23:04 AM
|
BLD-Framing/Rough-in | 2/5/2002 | 2/7/2002 | 2/7/2002 | A | PART |
Jim Storey
|
|
|
CHRIS - ###-#### framing ok all but perfarated sher panells,steel beam stifners west of entry at basment level missalined, bearing at floor trusses south east basement miss bearing point on paralam. 2/7/2002 11:24:03 AM
|
BLD-Aging Inspection | 1/8/2002 | 1/8/2002 | 1/8/2002 | | NR |
Carl Dependahl
|
|
|
wip, big sfd 1/8/2002 6:04:57 PM
|
BLD-Framing/Rough-in | 11/8/2001 | 11/8/2001 | 11/8/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### CHRIS EXTERIOR SHEER WALL ok ext shear 11/8/2001 2:09:09 PM
|
BLD-Framing/Rough-in | 11/7/2001 | 11/7/2001 | 11/7/2001 | P | NR |
Carl Dependahl
|
|
|
###-#### chris exterior sheer wall , nr recall. 11/7/2001 5:03:06 PM
|
BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/15/2001 10:43:04 AM w/ bldr re req's for fire doors.
|
BLD-Concrete | 9/10/2001 | 9/10/2001 | 9/10/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 9/10/2001 4:09:08 PM ok to place non shrink grout at bsmt col bases...will photo.
|
BLD-Foundation | 8/15/2001 | 8/15/2001 | 8/15/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### chris ( special inspection ) wip, pend report 8/15/2001 4:33:55 PM
|
BLD-Foundation | 8/8/2001 | 8/9/2001 | 8/9/2001 | P | PART |
Carl Dependahl
|
|
|
FOUND CHRIS ###-####--UNDER SPECIAL INSP - STRATA WILL BE THERE, pend report, ok 8/9/2001 5:16:42 PM
|
BLD-Framing/Rough-in | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PART |
Carl Dependahl
|
|
|
partial re-enforcement-- chris ###-#### --if possbile 2?????????????????pend spec insp 8/7/2001 5:03:47 PM
|
BLD-Foundation | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | PART |
Steven Webb
|
|
|
special inspection ###-#### Strata to provide report upon completion of project. To inspect every pour. 8/1/2001 9:44:39 AM
|
BLD-Foundation | 7/26/2001 | 7/26/2001 | 7/26/2001 | P | PART |
Dave Hannah
|
|
|
foundation reinforcement Chris ###-#### around 4:00 please under special inspection cmu fire place and elevator saft strata will check rebar 7/26/2001 4:12:03 PM
|
BLD-Foundation | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | PASS |
Dave Hannah
|
|
|
###-#### partial early as possible 7/25/2001 11:18:30 AM strata on site to insp and test 7/25/2001 11:19:27 AM
|
BLD-Foundation | 7/20/2001 | 7/20/2001 | 7/20/2001 | P | PART |
Russ Owen
|
|
|
RE-INFORCEMENT FOR THE FOUND- CHRIS ###-####. cmu ok also will be inspected by strata. 7/20/2001 3:24:10 PM
|
BLD-Foundation | 6/21/2001 | 6/22/2001 | 6/22/2001 | P | PART |
Carl Dependahl
|
|
|
Chris ###-####, spec. insp onsite; walls 6/22/2001 4:25:51 PM
|
BLD-Foundation | 6/6/2001 | 6/7/2001 | 6/7/2001 | A | PART |
Jim Storey
|
|
|
found --before 12 ???????- chris ###-####covered w special pending report. 6/7/2001 11:18:20 AM
|
BLD-Foundation | 6/6/2001 | 6/6/2001 | 6/6/2001 | P | PART |
Carl Dependahl
|
|
|
Chris ###-####...elev sump; recall for front wall & column when steel in place 6/6/2001 3:38:46 PM
|
BLD-Foundation | 5/29/2001 | 5/30/2001 | 5/30/2001 | A | PART |
Jim Storey
|
|
|
partial foundation reinforcement Chris ###-####-set up for special inspection for 5/29/01 mud is poured at 12:00 east wall ok for placement lou with mti will be on site. 5/30/2001 9:49:20 AM
|
BLD-Footing | 5/1/2001 | 5/3/2001 | 5/3/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### spec insp on site per 340 5/3/2001 1:31:53 PM
|
BLD-Conference | 5/2/2001 | 5/2/2001 | 5/2/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/2/2001 5:14:05 PM w/ Concrete contractor...need spec insp, too.
|
BLD-Conference | 4/23/2001 | 4/23/2001 | 4/23/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/23/2001 11:21:23 AM w/ Chris Walton re soils & spec insps: need approvals for actual site excavations & reinf'd concrete, not just cylinders. Will verify w/ DJO
|
BLD-Conference | 4/18/2001 | 4/20/2001 | 4/20/2001 | A | PART |
Jim Sly
|
|
|
chris ###-#### Met with Chris and STRATA soil Eng. to reveiw soils test report and Inspection procedures. 4/20/2001 12:22:31 PM
|
BLD-Footing | 3/16/2001 | 3/16/2001 | 3/16/2001 | P | PART |
Carl Dependahl
|
|
|
###-####; privacy fence only...need eng's/spec insp for struct fnd's 3/16/2001 2:55:22 PM
|