BLD-Final | 5/22/2001 | 5/24/2001 | 5/24/2001 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/22/2001 at 14:15:17. Contact: ###-####. 5/24/2001 1:04:28 PM ok for perm occ 5/24/2001 1:56:30 PM
|
FIRE-Alarm Testing | 5/22/2001 | 5/24/2001 | 5/24/2001 | A | PASS |
Joe Tawney
|
|
|
Reinsp OK on alarm system 5/24/2001 10:53:15 AM
|
FIRE-Final Inspection | 5/22/2001 | 5/24/2001 | 5/24/2001 | A | PASS |
Joe Tawney
|
|
|
Final OK for permanant occupancy 5/24/2001 10:52:43 AM
|
Permanent Occupancy | | 5/24/2001 | 5/24/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/10/2001 | 5/11/2001 | 5/11/2001 | A | FAIL |
Joe Tawney
|
|
|
fire sprinkler and fire alarm ###-#### Test duct det Fail improperly installed. Emerg and exit lights OK 5/11/2001 11:20:25 AM
|
BLD-Other | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 05/08/2001 at 15:47:51. Contact: ###-####. grid ceiling. 12/9/2001 12:29:18 PM
|
FIRE-Final Inspection | 5/4/2001 | 5/4/2001 | 5/4/2001 | P | PART |
Joe Tawney
|
|
|
John ###-#### Spklr rough in OK to cover exc SE co0rner office. 2heads off same drop in same room. 5/4/2001 3:11:25 PM
|
BLD-Framing/Rough-in | 4/10/2001 | 4/10/2001 | 4/10/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/10/2001 at 10:31:40. Contact: ###-####. l 4/11/2001 10:18:36 AMleft side offices ok to cover. 4/11/2001 10:18:52 AM
|
BLD-Framing/Rough-in | 3/29/2001 | 3/30/2001 | 3/30/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 14:49:15. Contact: ###-####.ok to sheet rock 3/30/2001 3:48:18 PM
|