Permit Information
Permit NumberBLD01-00440
StatusFinaled
Name HEWLETT-PACKARD CO
Site Address 11311 W CHINDEN BLVD
Project NameHP #2- MNS TEST CENTER
Customer Number 
ePlanReviewNo
Description
*MNS TEST CENTER* (HP #2) To perform a two phase remodel of a 15,626 sq. ft. area within the existing 76,000 s.f. HP Building #2, Lower, for use as a test center for new products and configurations, that could include servers & disc arrays. Phase I (5,844s.f.) to include construction of new interior non-bearing, non-combustible walls at the North & West end of new Test Area"s "1-A" & "Test Launch"; relocate & install existing demountable wall to the South side of Test Area "1-A"; install raised floor system & access ramps thereto & all applicable components to Test Area "1-A" & Test Launch to finish Phase 1, to include structural modifications for support of and placement of 4 mechanical 'Dry Cooler' units on the existing roof structure. Phase II (9,782s.f.) includes installation of raised floor within the Test Area's "1-B", "2" & "3"; removal of demountable partition between Test Areas "1-A & 1-B"; adjustment of ramp access to raised floor areas; modification of doors to power operated break away units, interstitial framing for electrical cable support system above raised floor areas through-out, new suspended ceiling grid system through-out test areas; new pumps & support system on mechanical mezzanine of Link between Bldgs. 2 & 3; additional 10 roof top 'Dry Coolers' & support structure on roof; and all electrical, plumbing, mechanical, fire & alarm system equipment and upgrades for the new "MNS Test Center" to function and remain code compliant. To remodel an existing 1,188 s.f. storage room. All per approved plans, notes on plans and attached plan review comments as part of approved plans. A "Letter of Completion / Compliance" is required for the final approval showing code compliance for use and occupancy. The rated 1-hour corridors located at the East & West ends of the new Test Areas shall be maintained. NOTE: This building is fully sprinkled for allowable area increase. PC#01-159/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/22/20018/23/20018/23/2001ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 08/22/2001 at 14:22:41. Contact: ###-####. needs plumb sign off 8/22/2001 10:35:24 PM
BLD-Final8/23/20018/23/20018/23/2001APASS
DetailsJoe Tawney
Added by Inspector: 406 On 8/23/2001 9:29:30 AM Reinsp OK for permanant occupancy
FIRE-Final Inspection8/17/20018/20/20018/20/2001PFAIL
DetailsJoe Tawney
Final Fail thumb turns and move one strobe in hallway 8/20/2001 6:38:20 PM
FIRE-Conference8/8/20018/9/20018/9/2001APASS
DetailsJoe Tawney
BLD-Framing/Rough-in7/31/20018/1/20018/1/2001PPASS
DetailsTom Arcoraci
Scheduled by Inspector: 408 On 7/31/2001 10:03:27 PM
BLD-Aging Inspection7/24/20017/24/20017/24/2001 PASS
DetailsTom Arcoraci
WIP 7/23/2001 8:22:58 PM