BLD-Final | 1/28/2002 | 1/28/2002 | 1/28/2002 | | DONE |
|
|
|
Final, ok per Jim Storey.
|
Permanent Occupancy | | 1/28/2002 | 1/28/2002 | | DONE |
|
|
|
|
BLD-Final | 12/28/2001 | 12/28/2001 | 12/28/2001 | P | DONE |
Jim Storey
|
|
|
CARL ###-####
|
BLD-Final | 12/27/2001 | 12/28/2001 | 12/28/2001 | A | PART |
Jim Storey
|
|
|
###-#### TEMPORARY OCCUPANCY temp ok pending achd and p&z sign off. 12/28/2001 11:11:03 AM
|
FIRE-Final Inspection | 12/28/2001 | 12/28/2001 | 12/28/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 12/28/2001 9:25:38 AM
|
BLD-Final | 12/21/2001 | 12/26/2001 | 12/26/2001 | A | FAIL |
Jim Storey
|
|
|
temp occ ###-#### fire stopping and handraillings/ ada gragbar and under sink protection. 12/26/2001 9:11:05 AM 12/26/2001 9:12:38 AM
|
BLD-Other | 12/21/2001 | 12/26/2001 | 12/26/2001 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/21/2001 at 15:01:28. Contact: . door sign/temp glazing/pending others. 12/26/2001 9:14:00 AM
|
FIRE-Conference | 12/21/2001 | 12/26/2001 | 12/26/2001 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/21/2001 at 11:04:11. Contact: ###-####. need address, hang extinguishers; 12/26/2001 8:25:36 AM
|
BLD-Wall cover | 11/7/2001 | 11/9/2001 | 11/9/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/07/2001 at 14:34:22. Contact: ###-####. Ok to cover office area--short guardrail was to short verbal correction given to correct--will verify correct height at final. 11/9/2001 9:58:45 AM
|
BLD-Framing/Rough-in | 10/30/2001 | 10/31/2001 | 10/31/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### c/n posted-no approved plans or the prior c/n. Do not cover. 10/31/2001 9:05:35 AM
|
BLD-Framing/Rough-in | 10/17/2001 | 10/18/2001 | 10/18/2001 | A | FAIL |
Jim Storey
|
|
|
###-####\\ steal stud c/n on site. 10/18/2001 3:52:37 PM
|
BLD-Foundation | 9/20/2001 | 9/21/2001 | 9/21/2001 | A | PASS |
Jim Storey
|
|
|
###-#### wall ok for cover south side of project. 9/21/2001 2:34:23 PM
|
BLD-Footing | 9/18/2001 | 9/18/2001 | 9/18/2001 | P | PASS |
Jim Storey
|
|
|
###-#### carl rebar south ft retaining wall ft ok 9/18/2001 11:43:26 AM
|
BLD-Conference | 9/13/2001 | 9/14/2001 | 9/14/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/13/2001 at 13:47:52. Contact: ###-####. placed with special insp. pending report for slab. 9/14/2001 10:03:19 AM
|
BLD-Footing | 8/28/2001 | 8/29/2001 | 8/29/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/28/2001 at 13:43:36. Contact: ###-####. mat rebar ok special insp. to be on site. 8/29/2001 9:57:30 AM
|
BLD-Footing | 8/23/2001 | 8/27/2001 | 8/24/2001 | A | CANC |
Jim Storey
|
|
|
FT INSP SKIP ###-#### Disp set to [CANC] by a contractor via Hello! on 08/24/2001 at 16:43:20.
|