BLD-Final | 8/9/2001 | 8/9/2001 | 8/9/2001 | P | PASS |
Carl Dependahl
|
|
|
###-#### ; c/n ok, card to contractor. 8/9/2001 5:13:41 PM
|
Permanent Occupancy | | 8/9/2001 | 8/9/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 6/25/2001 | 6/25/2001 | 6/25/2001 | A | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 6/25/2001 7:37:22 AM
|
BLD-Final | 6/15/2001 | 6/15/2001 | 6/15/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### keep c/n, kitchen ok for t/o 6/15/2001 6:20:34 PM
|
BLD-Conference | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | PASS |
Carl Dependahl
|
|
|
Jeff, ###-####; keep c/n...consult w/ fire insp. 6/13/2001 9:10:49 AM
|
BLD-Conference | 5/18/2001 | 5/21/2001 | 5/21/2001 | A | PASS |
Carl Dependahl
|
|
|
for conf-- ###-####- jeff ...obtain other sig's for final...ok for bar area 5/21/2001 3:49:37 PM
|
BLD-Final | 5/21/2001 | 5/21/2001 | 5/21/2001 | P | PART |
Carl Dependahl
|
|
|
temp occ Jeff ###-#### ...see c/n 5/21/2001 5:15:34 PM
|
BLD-Framing/Rough-in | 5/21/2001 | 5/21/2001 | 5/21/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/21/2001 10:30:37 AM ok to cover wall at hall; maintain exit req's
|
BLD-Conference | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/18/2001 1:18:56 PM w/ bldr...need clarify fire issues
|
FIRE-Sprinkler Rough-in | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PART |
Rick Jackson
|
|
|
Randy ###-#### temp issued per Dave Miler and alarm issues resolved 5/21/2001 7:12:00 AM
|
BLD-Conference | 5/15/2001 | 5/15/2001 | 5/15/2001 | P | PASS |
Carl Dependahl
|
|
|
###-#### Conference ...w/ bldr, returned approved resub 5/15/2001 2:51:27 PM
|
BLD-Conference | 5/11/2001 | 5/11/2001 | 5/11/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/11/2001 10:20:00 AM
|
BLD-Conference | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/9/2001 3:49:55 PM w/ Carl Westfall, submittal re entry/exit doors; ok as shown to sing entry doors in if signed and pemanently open during business.
|
BLD-Framing/Rough-in | 5/7/2001 | 5/8/2001 | 5/8/2001 | A | PART |
Carl Dependahl
|
|
|
Jeff Inman ###-#### please call 15 minutes before you go out; rec'd resub for entry door & fix for glu lam drilled 5/8/2001 11:43:38 AM
|
BLD-Framing/Rough-in | 5/8/2001 | 5/8/2001 | 5/8/2001 | P | PART |
Carl Dependahl
|
|
|
jeff ###-####, beam repaired per eng'r 5/8/2001 2:25:19 PM
|
BLD-Conference | 5/4/2001 | 5/4/2001 | 5/4/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/4/2001 8:37:50 AM w/ Jeff & eng'r re fix for bored glu-lam..submit spec.
|
BLD-Framing/Rough-in | 5/2/2001 | 5/3/2001 | 5/3/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### please call 15 minutes before you go out ok to cover bar soffit, kitchen side floors; eng'r to ok beam fix in writing 5/3/2001 12:24:07 PM
|
BLD-Framing/Rough-in | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### please call first 15 min. prior to meet there...conf w/ eng'r re 5/2/2001 12:40:30 PM c/n...holes at beam 5/2/2001 12:40:47 PM
|
BLD-Framing/Rough-in | 4/30/2001 | 5/1/2001 | 5/1/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### ok to cover walls at hallway & kitchen, keep c/n. ok to rock above soffit. 5/1/2001 2:26:10 PM
|
BLD-Framing/Rough-in | 4/27/2001 | 4/30/2001 | 4/30/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### call 15min before you go, c/n: nee deng'g for holes in beam for plbg, verify hood operation, submit for main doors. Ok to cover other walls 4/30/2001 1:23:16 PM
|
BLD-Conference | 4/26/2001 | 4/27/2001 | 4/27/2001 | A | PASS |
Carl Dependahl
|
|
|
jeff Inman ###-####, need other r/i's & arch's detail for walls prior to frame insp. 4/26/2001 2:27:10 PM
|
BLD-Conference | 4/26/2001 | 4/26/2001 | 4/26/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 4/26/2001 10:30:49 AM w/jeff re insp process
|