BLD-Final | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 07:53:26. Contact: ###-####. struct ok for perm...awaiting plbg perm final, need to install therapy tubs. 3/7/2002 1:57:07 PM
|
BLD-Final | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/06/2002 at 08:21:54. Contact: ###-####. need plans to site. 3/6/2002 3:17:14 PM
|
BLD-Final | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 3/6/2002 1:26:43 PM
|
BLD-Final | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 09:12:43. Contact: ###-####...need fire. 3/6/2002 1:29:19 PM
|
FIRE-Final Inspection | 3/5/2002 | 3/5/2002 | 3/5/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 09:09:16. Contact: ###-####.
|
FIRE-Final Inspection | 3/1/2002 | 3/4/2002 | 3/4/2002 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 03/01/2002 at 15:16:17. Contact: ###-####. voice fire alarm not working; damper access doors and damper not closing 3/4/2002 9:53:10 AM
|
BLD-Aging Inspection | 1/29/2002 | 1/29/2002 | 1/31/2002 | | NR |
Carl Dependahl
|
|
|
wip, 10th fl 1/31/2002 5:59:25 PM
|
Permanent Occupancy | | 1/28/2002 | 1/28/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 11/28/2001 | 11/29/2001 | 11/29/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 11/28/2001 at 09:34:03. Contact: ###-####...seal/firestop hvac, etc. above grid ;ok to tile exc as noted. 11/29/2001 5:03:50 PM
|
BLD-Framing/Rough-in | 10/29/2001 | 10/30/2001 | 10/30/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/29/2001 at 10:13:56. Contact: ###-####. Report from MTI for column fire proofing ok. Ok to sheetrock walls Smoke barrier not completelt constructed at this time ,need to recall, also no ceiling tile in at this time and penetration of firewalls not completed at this time. 10/31/2001 9:20:48 AM
|
BLD-Framing/Rough-in | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####, c/n, recxall. 10/18/2001 5:14:38 PM
|
BLD-Framing/Rough-in | 10/17/2001 | 10/17/2001 | 10/17/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/17/2001 at 08:31:22. Contact: ###-####...still need arch's clarification. 10/17/2001 4:32:37 PM
|
BLD-Framing/Rough-in | 10/15/2001 | 10/16/2001 | 10/16/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/15/2001 at 10:31:51. Contact: ###-####. incorrect permit #...recall. 10/16/2001 4:51:45 PM
|
BLD-Conference | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/12/2001 at 11:03:47. Contact: ###-####....w/ Jason, need drawings 9/12/2001 1:55:00 PM, verify req'd firerating at cols...main or secondary? 9/12/2001 2:39:35 PM
|