BLD-Final | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 14:11:42. Contact: ###-####.
|
BLD-Aging Inspection | 7/10/2001 | 7/10/2001 | 7/10/2001 | | PART |
Jim Sly
|
|
|
WIP 7/10/2001 10:46:32 AM
|
BLD-Energy code compliance | 5/9/2001 | 5/10/2001 | 5/10/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/09/2001 at 13:37:32. Contact: ###-####.
|
BLD-Framing/Rough-in | 5/2/2001 | 5/3/2001 | 5/3/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/02/2001 at 14:53:56. Contact: ###-####. C/N on site. 5/3/2001 11:42:45 AM
|
BLD-Framing/Rough-in | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PASS |
Dave Hannah
|
|
|
shear wall todd ###-#### 4/23/2001 2:24:26 PM ok to cover e 4/23/2001 3:08:02 PM xt only 4/23/2001 3:08:10 PM
|
BLD-Footing | 3/13/2001 | 3/13/2001 | 3/13/2001 | P | PASS |
Jim Sly
|
|
|
###-####
|