BLD-Final | 7/16/2002 | 7/17/2002 | 7/17/2002 | A | PASS |
Carl Dependahl
|
|
|
scott; Phone #: ###-#### rec'd eng's affidavit...ok 7/17/2002 11:36:50 AM
|
Permanent Occupancy | | 7/17/2002 | 7/17/2002 | | DONE |
|
|
|
|
BLD-Final | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | NR |
Carl Dependahl
|
|
|
see bld00-03519 6/18/2002 11:35:05 AM
|
BLD-Final | 6/17/2002 | 6/17/2002 | 6/17/2002 | P | NR |
Carl Dependahl
|
|
|
SCOTT ###-####
|
BLD-Final | 6/14/2002 | 6/14/2002 | 6/14/2002 | P | NR |
Carl Dependahl
|
|
|
scott ###-#### fn will recall 6/14/2002 5:17:46 PM
|
BLD-Final | 6/12/2002 | 6/13/2002 | 6/13/2002 | A | NR |
Jim Storey
|
|
|
|
BLD-Final | 1/16/2002 | 1/17/2002 | 1/17/2002 | A | PART |
Carl Dependahl
|
|
|
###-####, c/n, ok for t/o. 1/17/2002 3:51:20 PM
|
FIRE-Final Inspection | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | PASS |
Rick Jackson
|
|
|
###-#### okay to occupy this permitted area only pending structural approval 1/16/2002 2:06:28 PM
|
BLD-Final | 1/14/2002 | 1/14/2002 | 1/14/2002 | P | NR |
Carl Dependahl
|
|
|
###-####, need all ok's, recall. 1/14/2002 6:06:37 PM
|
BLD-Final | 1/9/2002 | 1/9/2002 | 1/11/2002 | P | CANC |
Carl Dependahl
|
|
|
###-####
|
BLD-Final | 1/10/2002 | 1/10/2002 | 1/10/2002 | P | CANC |
Russ Owen
|
|
|
###-####
|
BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/11/2001 | | NR |
Carl Dependahl
|
|
|
wip 12/11/2001 9:58:37 AM
|
BLD-Framing/Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-#### DRYWALL complete draft stops, firestops....sec 1 drywall ok 10/10/2001 6:02:08 PM
|
BLD-Framing/Rough-in | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | NR |
Carl Dependahl
|
|
|
fr insp -scott ###-####
|
BLD-Conference | 10/8/2001 | 10/8/2001 | 10/8/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/8/2001 10:45:38 AM reviewed archs letter to Dixie re use pf factory spec for dryer duct length...should be perm. labeled.
|
BLD-Conference | 10/5/2001 | 10/5/2001 | 10/5/2001 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/05/2001 at 09:59:15. Contact: ###-####...install 2 layers gyp at 2hr walls at ext sections...or equal 10/5/2001 5:13:50 PM
|
BLD-Conference | 10/4/2001 | 10/4/2001 | 10/4/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/4/2001 11:19:11 AM w/ bldr re 2hr wall terminations... need remove nailers, combustibles, & provide full depth blocking at floor lines & loft area
|
BLD-Energy code compliance | 10/3/2001 | 10/3/2001 | 10/3/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/3/2001 5:40:48 PM 2nd fl ins ok, sec 1
|
BLD-Energy code compliance | 10/3/2001 | 10/3/2001 | 10/3/2001 | P | PART |
Carl Dependahl
|
|
|
scott-- ###-#### energy code 1st fl, sec 1 10/3/2001 11:15:14 AM
|
BLD-Framing/Rough-in | 10/3/2001 | 10/3/2001 | 10/3/2001 | P | PART |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/3/2001 8:52:14 AM reinsp Scott ###-#### 1st/2nd fls sec 1ok to begin cover...drywall/firestop insp req'd 10/3/2001 5:39:24 PM c/n re 2hr walls at loft areas (4th fl.) 10/3/2001 5:41:34 PM
|
BLD-Energy code compliance | 10/1/2001 | 10/2/2001 | 10/2/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/01/2001 at 19:00:05. Contact: ###-####. 2nd fl. sec 1...complete firestops at plbg, elec per listing...recall 10/2/2001 10:58:37 AM
|
BLD-Energy code compliance | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | NR |
Carl Dependahl
|
|
|
scott ###-#### energy code ... fix plbg firestops. 10/2/2001 4:42:51 PM
|
BLD-Energy code compliance | 9/28/2001 | 10/1/2001 | 10/1/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### SCOTT 2nd fl, sec 1 ok to strip (rc channel), stock, & begin cover, keep c/n at remainder 10/1/2001 6:20:57 PM
|
BLD-Framing/Rough-in | 9/21/2001 | 9/24/2001 | 9/24/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### scott part, sec 1; keep c/n, ok to insul. 9/24/2001 5:35:34 PM
|
BLD-Framing/Rough-in | 9/20/2001 | 9/21/2001 | 9/21/2001 | A | FAIL |
Carl Dependahl
|
|
|
SCOTT ###-#### complete draft & fire stops verify all other r/i oks...keep c/n. 9/21/2001 4:34:45 PM
|
BLD-Framing/Rough-in | 9/18/2001 | 9/19/2001 | 9/19/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/18/2001 at 18:16:20. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/18/2001 | 9/18/2001 | 9/18/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####- scott fr sec 1, 1st fl; c/n fire stops/ blocks, draftstops, 2hr wall... 9/18/2001 6:20:48 PM 9/18/2001 6:21:59 PM
|
BLD-Framing/Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | CANC |
Carl Dependahl
|
|
|
###-#### carl i ran out of time to do these insp. 301 9/17/2001 7:11:56 PM
|
BLD-Concrete | 8/31/2001 | 9/4/2001 | 9/4/2001 | A | PART |
Carl Dependahl
|
|
|
scott ###-#### concrete; decks only, ok w/ spec insp. 9/4/2001 9:30:10 AM
|
BLD-Concrete | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### scott upper floor exit balconies. 8/27/2001 3:44:20 PM
|
BLD-Concrete | 8/22/2001 | 8/22/2001 | 8/22/2001 | P | PART |
Carl Dependahl
|
|
|
scott ###-####; 1st fl walks, exit balcony. 8/22/2001 1:45:35 PM
|
BLD-Conference | 8/17/2001 | 8/20/2001 | 8/20/2001 | A | PASS |
Carl Dependahl
|
|
|
###-#### scott tre fireblocks, firestops at loft party walls, rock both sides truss to deck 8/20/2001 11:47:25 AM
|
BLD-Conference | 8/9/2001 | 8/10/2001 | 8/10/2001 | A | PART |
Carl Dependahl
|
|
|
scott ###-#### for conference ; c/n : firestops, 2hr wall assy, damaged shear walls, fireblox/draftstops, etc. ok to continue; keep c/n re 3hr occ sep...elev. shaft protection. 8/10/2001 4:53:05 PM
|
BLD-Conference | 8/1/2001 | 8/2/2001 | 8/2/2001 | P | PASS |
Carl Dependahl
|
|
|
scott ###-####, w/ bldr re exhaust duc 8/2/2001 5:39:39 PM s 8/2/2001 5:39:47 PM
|
BLD-Conference | 7/27/2001 | 7/30/2001 | 7/30/2001 | A | PART |
Carl Dependahl
|
|
|
Scott kimball ###-####; c/n issued re shaft, 3hr protection at elev.; firestop at tubs 7/30/2001 4:44:13 PM
|
BLD-Conference | 7/24/2001 | 7/25/2001 | 7/25/2001 | P | CANC |
Russ Owen
|
|
|
###-#### Scott .wil recall for carl. 7/25/2001 1:07:51 PM
|
BLD-Conference | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 7/10/2001 3:56:59 PM w/Mike Phillips, need 3hr door at elevator ( or equal as approved) as noted during inspection; shafts to be req'd per plan check interpretation of 710 & 711.3 ubc 7/10/2001 4:04:05 PM
|
BLD-Conference | 6/29/2001 | 7/3/2001 | 7/3/2001 | A | PART |
Carl Dependahl
|
|
|
scott ###-#### please call before going out; need to address opening at 3hr floor for elev. 7/3/2001 12:13:15 PM
|
BLD-Conference | 6/19/2001 | 6/19/2001 | 6/19/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/19/2001 12:18:59 PM re 2hr walls w/ framer; show approved details.
|
BLD-Conference | 6/18/2001 | 6/18/2001 | 6/18/2001 | P | PART |
Carl Dependahl
|
|
|
scott ###-####, need all spec insp reprts for parking gar.6/19/2001 5:34:30 PM 6/19/2001 5:38:52 PM
|