BLD-Aging Inspection | 10/13/2003 | 10/13/2003 | 10/13/2003 | | PASS |
Dave Hannah
|
|
|
wip 10/13/2003 8:11:43 AM
|
BLD-Aging Inspection | 8/5/2003 | 8/5/2003 | 8/5/2003 | | PASS |
Carl Dependahl
|
|
|
awaiting c/n resolution re doors at 2hr wall...phased project, WIP. 8/5/2003 9:33:06 AM
|
BLD-Aging Inspection | 6/3/2003 | 6/3/2003 | 6/3/2003 | | DONE |
Carl Dependahl
|
|
|
has c/n...wip per supt. Kelly. 6/3/2003 1:37:11 PM
|
BLD-Final | 4/1/2003 | 4/1/2003 | 4/1/2003 | P | PART |
Carl Dependahl
|
|
|
kelly; Phone #: ###-#### Internet Inspection Request from: Annette Moore...c/n re hand rails & 90 min occ. sep. doors; ok to use 1st fl exec offices. 4/1/2003 5:01:49 PM
|
BLD-Final | 3/21/2003 | 3/24/2003 | 3/24/2003 | A | FAIL |
Carl Dependahl
|
|
|
KELLY; Phone #: ###-#### Internet Inspection Request from: Darla Downs... 3/24/2003 11:23:52 AM; c/n, other insps, complete glazing, submit stamped modifications, show rated details 3/24/2003 11:51:32 AM
|
FIRE-Final Inspection | 3/20/2003 | 3/21/2003 | 3/21/2003 | A | PASS |
Rick Jackson
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 3/5/2003 | 3/6/2003 | 3/6/2003 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 3/5/2003 at 6:51:02 AM. Contact: ###-####....ok to tile lids at office & west portion; need to remove misc. penetrations at exit passageway....large conduit w/o boxes, piping, etc. advise supt. 3/6/2003 3:59:40 PM
|
BLD-Framing/Rough-in | 2/11/2003 | 2/12/2003 | 2/12/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 2/11/2003 at 7:32:26 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/12/2003 | 2/12/2003 | 2/12/2003 | P | NR |
Carl Dependahl
|
|
|
need eng's ok for substandard spec. insp report...hvac permit expired? 2/12/2003 2:28:52 PM
|
BLD-Conference | 12/23/2002 | 12/26/2002 | 12/26/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 09:13:53. Contact: ###-####.
|
BLD-Conference | 12/26/2002 | 12/26/2002 | 12/26/2002 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 7/25/2002 | 7/25/2002 | 7/25/2002 | P | PART |
Carl Dependahl
|
|
|
dan; Phone #: ###-####...clg grid nr, wip; advised supt that shell not finalled ...need eng's ok, re mti reports of failure 7/25/2002 9:02:02 AM
|
BLD-Framing/Rough-in | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | FAIL |
Carl Dependahl
|
|
|
fr insp - dan ###-#### ; need special insp for spray-on f.p. remove ducts at exit (back of communications rm.) & repair 2hr wall...firestop toggles at same. 3/8/2002 1:53:36 PM
|
BLD-Framing/Rough-in | 2/11/2002 | 2/12/2002 | 2/12/2002 | A | PART |
Carl Dependahl
|
|
|
###-#### firestop floors, clarify shaft penetration(hvac) 2/12/2002 12:51:36 PM
|
BLD-Framing/Rough-in | 2/7/2002 | 2/8/2002 | 2/8/2002 | P | NR |
Carl Dependahl
|
|
|
###-#### DAN; need eng's approval re seismic upgrade, verify other ok's. recall. 2/8/2002 5:37:01 PM
|
BLD-Conference | 12/17/2001 | 12/17/2001 | 12/17/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/17/2001 3:06:15 PM w/eng'r, need report for struct upgrade & appropriate testing.
|
BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/17/2001 | | NR |
Carl Dependahl
|
|
|
wip, 1st fl. west wing. 12/17/2001 3:05:17 PM
|
BLD-Aging Inspection | 10/8/2001 | 10/8/2001 | 10/8/2001 | | NR |
Carl Dependahl
|
|
|
wip 10/9/2001 2:57:25 PM
|
BLD-Aging Inspection | 8/6/2001 | 8/6/2001 | 8/6/2001 | | PASS |
Carl Dependahl
|
|
|
wip 8/6/2001 10:11:07 AM
|
BLD-Conference | 5/30/2001 | 5/30/2001 | 5/30/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/30/2001 2:41:01 PM w/ St Lukes...wip
|