Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD01-00599
StatusFinaled
Name PARK APARTMENTS II
Site Address 1079 S DALE ST
Project NamePARK APARTMENTS II
Customer Number 
ePlanReviewNo
Description
Type "A-8" BUILDING * To construct a new two story, with basement and mezzanines 3,968 sq.ft. wood framed, 10 unit apartment building. The basement is 2,192 sq.ft and has four unit @ 548 sq.ft. each. The first floor is 2,532 sq.ft. and contains four units, two @ 548 sq.ft and two @ 604 sq.ft with a 114 sq.ft. mezzanine. The second floor is 1,436 sq.ft. and contains two units @ 604 sq.ft. with a 114 sq.ft. mezzanine. All construction per the approved plans, attached comment list, CABO/ANSI A 117.1. DRH 00-00239 CUP 00-00136 MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/17/20027/17/20027/17/2002PPASS
DetailsCarl Dependahl
dave; Phone #: ###-####
Permanent Occupancy 7/17/20027/17/2002 DONE
Details
BLD-Final4/26/20024/26/20024/26/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/26/2002 at 08:10:04. Contact: ###-####. ok for t/o, c/n rails, plbg, temp glass 4/26/2002 5:07:21 PM
BLD-Final4/24/20024/25/20024/25/2002PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/24/2002 at 17:01:58. Contact: ###-####. cn issued not ready 4/25/2002 2:58:39 PM
BLD-Final4/23/20024/24/20024/24/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/23/2002 at 15:35:43. Contact: ###-####.
FIRE-Final Inspection4/23/20024/24/20024/24/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/23/2002 at 15:34:55. Contact: ###-####.
Code Occupancy Approval  4/11/2002 PASS
SIGNED FINAL AS WE ARE HOLDING LARGE BOND FOR LANDSCAPE.
BLD-Conference1/28/20021/28/20021/28/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/28/2002 9:57:12 AM w/ Jeff Langen proj mgr...is faxing flood certs to site, apparently were given to Jim Wylie in pub wks as they weren't in plan chk log; also eng's written report re int shear walls to be provided, observation was made.
BLD-Framing/Rough-in1/22/20021/22/20021/22/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/22/2002 12:24:10 PM part, keep c/n re ext stairs, rest ok
BLD-Wall cover1/18/20021/22/20021/22/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/18/2002 at 16:04:47. Contact: ###-####....need eng's ok for 1st fl gypsum shear walls 1/22/2002 3:03:16 PM
BLD-Framing/Rough-in1/15/20021/16/20021/16/2002PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/15/2002 at 10:34:45. Contact: ###-####.c/n, ok to insul 1/16/2002 6:06:35 PM
BLD-Aging Inspection12/24/200112/24/200112/27/2001 NR
DetailsCarl Dependahl
apts, wip 12/27/2001 8:57:03 AM
BLD-Conference10/23/200110/23/200110/23/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/23/2001 8:59:29 AM w/Otis L. at site re "shear" c/n... awaiting add'l eng'g.
BLD-Framing/Rough-in9/5/20019/5/20019/5/2001PPART
DetailsCarl Dependahl
###-#### jim 1st fl shear nailing ok 9/5/2001 3:45:04 PM
BLD-Framing/Rough-in8/3/20018/3/20018/3/2001PPART
DetailsCarl Dependahl
rebar jim ###-####
BLD-Foundation7/18/20017/19/20017/19/2001PPASS
DetailsJim Storey
re-bar Jim ###-####