Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD01-00607
StatusFinaled
Name PARK APARTMENTS II
Site Address 1071 S DALE ST
Project NamePARK APARTMENTS II
Customer Number 
ePlanReviewNo
Description
Type "B-9" BUILDING * To construct a new two story, with basement and mezzanines 5,144 sq.ft. wood framed, 12 unit apartment building. The basement is 2,220 sq.ft and has two units @ 562 sq.ft and two units @ 548 sq.ft.each. The first floor is 2,220 sq.ft. and contains two units @ 562 sq.ft. and two units and 548 sq.ft. each. The second floor contains four units @ 615 sq.ft with a 116 sq.ft. mezzanine. All construction per the approved plans, attached comment list, CABO/ANSI A 117.1. DRH 00-00239 CUP 00-00136 MJP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/17/20027/17/20027/17/2002PPASS
DetailsCarl Dependahl
dave; Phone #: ###-####
Permanent Occupancy 7/17/20027/17/2002 DONE
Details
BLD-Final4/26/20024/26/20024/26/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/26/2002 at 08:11:21. Contact: ###-####. c/n rails, plbg ok for t/o 4/26/2002 5:06:41 PM
BLD-Final4/24/20024/25/20024/25/2002PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/24/2002 at 17:02:58. Contact: ###-####. cn issued not ready 4/25/2002 2:58:27 PM
BLD-Final4/23/20024/24/20024/24/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/23/2002 at 15:37:38. Contact: ###-####.
FIRE-Final Inspection4/23/20024/24/20024/24/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/23/2002 at 15:36:50. Contact: ###-####.
Code Occupancy Approval  4/11/2002 PASS
SIGNED FINAL AS WE ARE HOLDING LARGE BOND FOR LANDSCAPE.
BLD-Energy code compliance1/28/20021/28/20021/28/2002PPASS
DetailsDave Hannah
Added by Inspector: 425 On 1/28/2002 4:47:41 PM walked project with carl dependahl insulation ok ok to cover still have issues with stairs and first level shear walls
BLD-Wall cover1/26/20021/28/20021/28/2002ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/26/2002 at 09:58:22. Contact: ###-####.
BLD-Framing/Rough-in1/25/20021/25/20021/25/2002PNR
DetailsCarl Dependahl
Scheduled by Inspector: 407 On 1/25/2002 11:43:30 AM ...verify flood certs as req'd; no insp 1/25/2002 6:02:59 PM
BLD-Wall cover1/24/20021/25/20021/25/2002ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/24/2002 at 18:14:12. Contact: ###-####.
BLD-Framing/Rough-in1/18/20021/22/20021/22/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/18/2002 at 16:06:09. Contact: ###-####...need verify common stair dimensions. 1/22/2002 3:02:34 PM
BLD-Framing/Rough-in1/22/20021/22/20021/22/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/22/2002 12:21:56 PM c/n,ext stairs, engs letter re gyp shear, verify flood certs recorded w/ city.
BLD-Aging Inspection11/28/200111/28/200111/28/2001 NR
DetailsCarl Dependahl
wip 11/28/2001 6:06:49 PM
BLD-Framing/Rough-in9/24/20019/25/20019/25/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/24/2001 at 17:10:12. Contact: ###-####. upper floors shear ok 9/25/2001 10:28:19 AM
BLD-Framing/Rough-in9/19/20019/19/20019/20/2001PPART
DetailsCarl Dependahl
fr insp -dave shear 1st fl shear nailing ok 9/20/2001 10:15:12 AM...Still need eng's report/details re: shear wall sheathing not continuous to sills; question regarding stud size,spacing as per T23-IV-B. at brg walls 1st fl. 9/20/2001 10:24:27 AM
BLD-Framing/Rough-in9/5/20019/5/20019/5/2001PPART
DetailsCarl Dependahl
###-#### jim 1st fl shear ok. 9/5/2001 3:44:41 PM
BLD-Framing/Rough-in8/3/20018/3/20018/3/2001PPART
DetailsCarl Dependahl
rebar insp --jim ###-####
BLD-Foundation7/26/20017/26/20017/26/2001PPASS
DetailsJim Storey
stem wall\\###-#### rebar ok 7/26/2001 9:26:20 AM
BLD-Footing7/5/20017/5/20017/5/2001PPASS
DetailsJim Storey