BLD-Final | 7/17/2002 | 7/17/2002 | 7/17/2002 | P | PASS |
Carl Dependahl
|
|
|
dave; Phone #: ###-####
|
Permanent Occupancy | | 7/17/2002 | 7/17/2002 | | DONE |
|
|
|
|
BLD-Final | 4/26/2002 | 4/26/2002 | 4/26/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 08:11:21. Contact: ###-####. c/n rails, plbg ok for t/o 4/26/2002 5:06:41 PM
|
BLD-Final | 4/24/2002 | 4/25/2002 | 4/25/2002 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/24/2002 at 17:02:58. Contact: ###-####. cn issued not ready 4/25/2002 2:58:27 PM
|
BLD-Final | 4/23/2002 | 4/24/2002 | 4/24/2002 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 15:37:38. Contact: ###-####.
|
FIRE-Final Inspection | 4/23/2002 | 4/24/2002 | 4/24/2002 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 04/23/2002 at 15:36:50. Contact: ###-####.
|
Code Occupancy Approval | | | 4/11/2002 | | PASS |
|
|
|
SIGNED FINAL AS WE ARE HOLDING LARGE BOND FOR LANDSCAPE.
|
BLD-Energy code compliance | 1/28/2002 | 1/28/2002 | 1/28/2002 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/28/2002 4:47:41 PM walked project with carl dependahl insulation ok ok to cover still have issues with stairs and first level shear walls
|
BLD-Wall cover | 1/26/2002 | 1/28/2002 | 1/28/2002 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/26/2002 at 09:58:22. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/25/2002 | 1/25/2002 | 1/25/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by Inspector: 407 On 1/25/2002 11:43:30 AM ...verify flood certs as req'd; no insp 1/25/2002 6:02:59 PM
|
BLD-Wall cover | 1/24/2002 | 1/25/2002 | 1/25/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/24/2002 at 18:14:12. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/18/2002 | 1/22/2002 | 1/22/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 01/18/2002 at 16:06:09. Contact: ###-####...need verify common stair dimensions. 1/22/2002 3:02:34 PM
|
BLD-Framing/Rough-in | 1/22/2002 | 1/22/2002 | 1/22/2002 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/22/2002 12:21:56 PM c/n,ext stairs, engs letter re gyp shear, verify flood certs recorded w/ city.
|
BLD-Aging Inspection | 11/28/2001 | 11/28/2001 | 11/28/2001 | | NR |
Carl Dependahl
|
|
|
wip 11/28/2001 6:06:49 PM
|
BLD-Framing/Rough-in | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/24/2001 at 17:10:12. Contact: ###-####. upper floors shear ok 9/25/2001 10:28:19 AM
|
BLD-Framing/Rough-in | 9/19/2001 | 9/19/2001 | 9/20/2001 | P | PART |
Carl Dependahl
|
|
|
fr insp -dave shear 1st fl shear nailing ok 9/20/2001 10:15:12 AM...Still need eng's report/details re: shear wall sheathing not continuous to sills; question regarding stud size,spacing as per T23-IV-B. at brg walls 1st fl. 9/20/2001 10:24:27 AM
|
BLD-Framing/Rough-in | 9/5/2001 | 9/5/2001 | 9/5/2001 | P | PART |
Carl Dependahl
|
|
|
###-#### jim 1st fl shear ok. 9/5/2001 3:44:41 PM
|
BLD-Framing/Rough-in | 8/3/2001 | 8/3/2001 | 8/3/2001 | P | PART |
Carl Dependahl
|
|
|
rebar insp --jim ###-####
|
BLD-Foundation | 7/26/2001 | 7/26/2001 | 7/26/2001 | P | PASS |
Jim Storey
|
|
|
stem wall\\###-#### rebar ok 7/26/2001 9:26:20 AM
|
BLD-Footing | 7/5/2001 | 7/5/2001 | 7/5/2001 | P | PASS |
Jim Storey
|
|
|
|