BLD-Final | 5/14/2002 | 5/14/2002 | 5/14/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### VAL
|
BLD-Final | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | CANC |
Russ Owen
|
|
|
###-####
|
Code Occupancy Approval | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | DONE |
Wm. Michael Meloy
|
|
|
Signed off 5/14/2002 11:46:32 AM
|
Code Occupancy Approval | | | 5/13/2002 | | PASS |
|
|
|
|
FIRE-Final Inspection | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 5/13/2002 8:01:47 AM
|
BLD-Final | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Final | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | CANC |
Dave Hannah
|
|
|
###-#### Gave back to Dave. 5/8/2002 11:15:44 AM
|
FIRE-Final Inspection | 5/1/2002 | 5/2/2002 | 5/2/2002 | P | FAIL |
Troy Cobbley
|
|
|
elevator recall did not work, change door hardware to ADA approved type, remove thumbturn and put up sticker on main exit, provide fire extinguisher, relocate 2nd floor smoke detector to deck, verify need for "knox box". Approved plan notes are missing. Notified Val that there may be other items on the notes that will need addressing 5/2/2002 3:30:18 PM
|
FIRE-Final Inspection | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | CANC |
Troy Cobbley
|
|
|
duplicate inspection 5/2/2002 2:04:38 PM
|
BLD-Framing/Rough-in | 4/1/2002 | 4/1/2002 | 4/1/2002 | P | PART |
Dave Hannah
|
|
|
###-#### VALc/n on site 4/1/2002 3:02:48 PM
|
BLD-Conference | 2/1/2002 | 2/1/2002 | 2/1/2002 | P | DONE |
Dave Hannah
|
|
|
###-####
|
BLD-Conference | 1/23/2002 | 1/23/2002 | 1/23/2002 | P | DONE |
Dave Hannah
|
|
|
Added by Inspector: 425 On 1/23/2002 3:47:16 PM Bob A Val and myself disscussed 1hr wall on east side of building
|
BLD-Energy code compliance | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Framing/Rough-in | 1/15/2002 | 1/16/2002 | 1/16/2002 | A | PART |
Dave Hannah
|
|
|
fr insp chris ###-#### trusses are ok draft stop ok freaming ok needs hangers for sec floor south end have to check 1hr ext wall 1/16/2002 12:57:10 PM
|
BLD-Framing/Rough-in | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### didnt do a c/n to much all the truss supports not in all the 2ply truss not nailed no supprots under ends of beams and grider trusses hangers missing or not nailed beam straping need eng on inter shear wall draft stoppes in attic 1/11/2002 3:37:16 PM
|
BLD-Framing/Rough-in | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | NR |
Tom Arcoraci
|
|
|
###-####
|
BLD-Aging Inspection | 12/24/2001 | 12/24/2001 | 12/24/2001 | | DONE |
Dave Hannah
|
|
|
W.I.P 12/24/2001 10:14:36 AM
|
BLD-Framing/Rough-in | 10/23/2001 | 10/24/2001 | 10/24/2001 | A | PASS |
Dave Hannah
|
|
|
shear insp --val ###-#### OK TO COVER EXT WALLS 10/24/2001 10:35:20 AM
|
BLD-Framing/Rough-in | 10/16/2001 | 10/17/2001 | 10/17/2001 | A | FAIL |
Dave Hannah
|
|
|
###-#### after 9am shear nailing on southwall need rfi from engineer 10/17/2001 12:26:42 PM
|
BLD-Conference | 8/29/2001 | 8/29/2001 | 8/29/2001 | P | DONE |
Dave Hannah
|
|
|
val-- ###-#### for conf we are going back to org city approved plans for wood framing 8/29/2001 3:25:51 PM
|
BLD-Footing | 8/29/2001 | 8/29/2001 | 8/29/2001 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 8/22/2001 | 8/22/2001 | 8/22/2001 | P | PASS |
Dave Hannah
|
|
|
okay by mike phillups to do footing inspection val ###-#### columns and ext stairs footings 8/22/2001 4:07:12 PM
|
BLD-Footing | 8/7/2001 | 8/7/2001 | 8/7/2001 | P | PASS |
Dave Hannah
|
|
|
for elevator ###-####
|
BLD-Footing | 7/31/2001 | 8/1/2001 | 8/1/2001 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 16:27:10. Contact: ###-####. 11am boards only 1/2 up. i reschedualed this myself. 8/1/2001 11:13:48 AM
|
BLD-Footing | 8/1/2001 | 8/1/2001 | 8/1/2001 | P | PASS |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 8/1/2001 11:53:22 AM walls. 8/1/2001 4:13:08 PM
|
BLD-Footing | 7/26/2001 | 7/27/2001 | 7/27/2001 | A | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 7/25/2001 | 7/26/2001 | 7/26/2001 | A | CANC |
Dave Hannah
|
|
|
###-#### cancelled by val
|