BLD-Final | 7/2/2002 | 7/2/2002 | 7/2/2002 | A | PASS |
Jim Storey
|
|
|
card not avalable
|
Permanent Occupancy | | 7/2/2002 | 7/2/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/1/2002 | 7/1/2002 | 7/1/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 7/1/2002 2:54:40 PM
|
BLD-Final | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/27/2002 at 14:01:53. Contact: ###-####.
|
Code Occupancy Approval | 6/28/2002 | 6/28/2002 | 6/27/2002 | A | PASS |
Wm. Michael Meloy
|
|
|
|
FIRE-Final Inspection | 6/20/2002 | 6/20/2002 | 6/20/2002 | P | FAIL |
Rick Jackson
|
|
|
Added by Inspector: 409 On 6/20/2002 4:32:21 PM need adress; fire bell not working; canopies for sprinklers; smoke detectors - some need batteries
|
FIRE-Final Inspection | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | CANC |
Rick Jackson
|
|
|
frank ###-#### fire fn need to reschedule for 6/20 6/19/2002 4:00:47 PM
|
BLD-Energy code compliance | 4/19/2002 | 4/22/2002 | 4/22/2002 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 14:33:48. Contact: ###-####. c/n ok except for pannels and heaters fire stopping. 4/22/2002 1:50:50 PM
|
BLD-Energy code compliance | 4/17/2002 | 4/19/2002 | 4/19/2002 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/17/2002 at 13:15:08. Contact: ###-####. draft stopp complet ok to rock 3rd floor only. 4/19/2002 2:20:29 PM
|
BLD-Framing/Rough-in | 4/17/2002 | 4/19/2002 | 4/19/2002 | A | PART |
Jim Storey
|
|
|
1. (Fire blocks and draft stops) In combustible construction, fireblocking and draftstopping shall be installed to cut off all concealed draft openings (both vertical and horizontal) and shall form an effective barrier between floors, between a top story and a roof or attic space, and shall subdivide attic spaces, concealed roof spaces and floor-ceiling assemblies. The integrity of all fire blocks and draft stops shall be maintanined. (1997 UBC 708.1) 2. maintane 1 hr. occ septration at grage to r1 rock and fire stop at ele pannel box. 3. bearing blk under mlb to window header 4. insulate 2nd floor rim joist. 5. seal top plates in grage and ele ceilling boxes to meet bcic.
|
BLD-Aging Inspection | 10/23/2001 | 10/23/2001 | 10/23/2001 | | PASS |
Jim Storey
|
|
|
wip 10/23/2001 8:29:36 AM
|
BLD-Foundation | 8/22/2001 | 8/23/2001 | 8/23/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/22/2001 at 09:34:37. Contact: ###-####. inspection by s-i. 8/23/2001 8:55:32 AM
|
BLD-Footing | 7/11/2001 | 7/12/2001 | 7/12/2001 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 07/11/2001 at 10:01:48. Contact: ###-####. garages...looks ok; pend spec insp report (Strata onsite) 7/12/2001 11:09:53 AM
|
BLD-Energy code compliance | 4/23/2002 | 3/25/2000 | 3/25/2000 | P | PASS |
Jim Storey
|
|
|
c/n made ok on fire stopping ok to cover bld.
|