Permit Information
Permit NumberBLD01-00650
StatusFinaled
Name RIVER QUARRY APARTMENTS II
Site Address 1486 S LOGGERS POND PL
Project NameRIVER QUARRY APARTMENTS II
Customer Number 
ePlanReviewNo
Description
BUILDING # 23, TYPE II, 12 UNITS * TO CONSTRUCT A NEW THREE STORY, WOOD FRAMED, TYPE V ONE-HOUR, 12 UNIT APARTMENT BUILDING. THE FIRST FLOOR CONTAINS 4-ONE BEDROOM, ONE BATHROOM @ 790 SQ.FT EACH WITN 2684 SQ.FT OF GARAGE AREA. THE SECOND FLOOR CONTAINS 3-TWO BEDROOM TWO BATHROOM UNIT @ 1146 SQ.FT. EACH. 1- THREE BEDROOM TWO BATHROOM UNIT @ 1344 SQ.FT. THE THIRD FLOOR CONTAINS 3-TWO BEDROOM TWO BATHROOM UNIT @ 1146 SQ.FT. EACH AND 1-THREE BEDROOM TWO BATHROOM UNIT AT 1344 SQ.FT. THE FIRST FLOOR IS APPROXIMATELY 3160 SQ.FT. FOR LIVING AREA THE SECOND FLOOR IS APPROXIMATELY 4782 SQ.FT. OF LIVING AREA THE THIRD FLOOR IS APPROXIMATELY 4782 SQ.FT. FOR LIVING AREA. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. NOTE: THIS BUILDING MUST BE FIRE SPRINKLERED TO MEET NFPA 13-R. MJP (P.C.#o232-01 ) DRH 01-0006 & CUP # 00-154
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/5/20024/5/20024/5/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/05/2002 at 07:36:28. Contact: ###-####. c/n made ok c/o ok 4/5/2002 3:31:35 PM
Permanent Occupancy 4/5/20024/5/2002 DONE
Details
BLD-Final4/3/20024/4/20024/4/2002AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/03/2002 at 15:17:52. Contact: ###-####. landings at 3rd floor exit max 3/4 elavation transition. 4/4/2002 11:58:14 AM
FIRE-Final Inspection3/26/20023/26/20023/26/2002PPASS
DetailsRick Jackson
###-####
FIRE-Final Inspection3/14/20023/15/20023/15/2002PFAIL
DetailsRick Jackson
###-#### need additional module on alarm panel to monitor spervisory signal; horn not installed in bedroom in one unit 3/15/2002 5:11:33 PM
BLD-Energy code compliance12/19/200112/19/200112/19/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/19/2001 at 09:31:09. Contact: ###-####. framing and insulation ok. 12/19/2001 3:38:32 PM
BLD-Energy code compliance12/17/200112/18/200112/18/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/17/2001 at 11:35:03. Contact: ###-####. 2nd and 3rd floors ok 12/19/2001 11:32:59 AM
BLD-Energy code compliance12/14/200112/14/200112/14/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/14/2001 at 11:08:05. Contact: ###-####.
BLD-Framing/Rough-in12/12/200112/13/200112/13/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/12/2001 at 16:03:30. Contact: ###-####.
BLD-Aging Inspection10/8/200110/8/200110/8/2001 PASS
DetailsJim Storey
wip 10/8/2001 4:47:52 PM
BLD-Concrete8/6/20018/7/20018/7/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/06/2001 at 08:43:27. Contact: ###-####.s-i on site. 8/7/2001 12:07:03 PM
BLD-Foundation7/18/20017/19/20017/19/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/18/2001 at 15:04:17. Contact: ###-####. strata on site to inspect and test concrete along with rebar 7/19/2001 11:12:28 AM
BLD-Footing6/20/20016/21/20016/21/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 06/20/2001 at 09:20:24. Contact: ###-####.pouring when I got here, looks ok so far, special inspector on job, pending report. 6/21/2001 11:09:01 AM