BLD-Final | 5/11/2002 | 5/13/2002 | 5/13/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/11/2002 at 10:55:53. Contact: ###-####. final ok 5/13/2002 9:55:03 AM
|
BLD-Final | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 13:46:32. Contact: ###-####.
|
BLD-Final | 5/3/2002 | 5/6/2002 | 5/6/2002 | A | PART |
Jim Storey
|
|
|
1. inside units ok for final
2. (Guardrail height) The top of guardrails shall not be less than 42" in height. The top of guardrails for stairways, exclusive of their landings, shall be placed not less than 34" above the nosing of stair treads, measured vertically. (1997 UBC 509.2 and Exception #3)
|
BLD-Final | 5/2/2002 | 5/3/2002 | 5/3/2002 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/02/2002 at 16:19:36. Contact: ###-####. out of time. 5/3/2002 5:16:49 PM
|
FIRE-Final Inspection | 5/3/2002 | 5/3/2002 | 5/3/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 5/3/2002 4:29:28 PM
|
Permanent Occupancy | | 5/3/2002 | 5/3/2002 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 4/26/2002 | | PASS |
|
|
|
|
FIRE-Final Inspection | 4/24/2002 | 4/25/2002 | 4/25/2002 | A | FAIL |
Rick Jackson
|
|
|
###-#### sound level in bedrooms below 70 db 4/25/2002 11:27:00 AM
|
BLD-Conference | 1/11/2002 | 1/14/2002 | 1/14/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/11/2002 at 13:25:16. Contact: ###-####. 2 hr wall ok for all memprane penatations south side. ok to cover all walls and ceilling. 1/14/2002 2:30:37 PM
|
BLD-Energy code compliance | 1/9/2002 | 1/10/2002 | 1/10/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/09/2002 at 11:17:08. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/4/2002 | 1/7/2002 | 1/7/2002 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/04/2002 at 11:43:24. Contact: ###-####. patch 2 hr wall/ extened 1 hr behind shower. ok to insulate. 1/7/2002 3:24:25 PM
|
BLD-Framing/Rough-in | 1/3/2002 | 1/4/2002 | 1/4/2002 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 09:48:21. Contact: ###-####. via called to canc. 1/4/2002 1:53:09 PM
|
BLD-Aging Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 | | PASS |
Jim Storey
|
|
|
wip 10/15/2001 8:36:35 AM
|
BLD-Concrete | 8/14/2001 | 8/15/2001 | 8/15/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/14/2001 at 12:40:56. Contact: ###-####. placed w/special insp. 8/15/2001 11:58:14 AM
|
BLD-Foundation | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 07/24/2001 at 15:01:25. Contact: ###-####. placed with special insp pending report. 7/25/2001 10:18:20 AM
|
BLD-Footing | 6/28/2001 | 6/29/2001 | 6/29/2001 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/28/2001 at 11:47:48. Contact: ###-####. placedwith special insp. 6/29/2001 9:13:00 AM
|