BLD-Final | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PASS |
Russ Owen
|
|
|
MARK ###-#### Ok for perm oc all required signatures have signed permanent.1/2/2002 5:44:20 PM 1/2/2002 5:44:52 PM
|
Permanent Occupancy | | 1/2/2002 | 1/2/2002 | | DONE |
|
|
|
|
BLD-Final | 12/27/2001 | 12/27/2001 | 12/27/2001 | P | PART |
Russ Owen
|
|
|
###-####c/n posted. 12/27/2001 1:14:55 PM
|
FIRE-Final Inspection | 12/26/2001 | 12/27/2001 | 12/27/2001 | A | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled 12/27/2001 2:30:13 PM
|
BLD-Conference | 11/28/2001 | 11/28/2001 | 11/28/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/28/2001 11:35:24 AM Met with contractor. Explained where exit signs, emergency lights, fire extinguishers need to be placed. Also went over door hardware and access to the property
|
BLD-Framing/Rough-in | 10/24/2001 | 10/24/2001 | 10/24/2001 | P | PART |
Dave Hannah
|
|
|
Frank Page, ###-#### needs to move people form ext offices to new offices so they can start remoldeling ext offices ok t 10/24/2001 1:02:45 PM o move 10/24/2001 1:02:53 PM
|
FIRE-Final Inspection | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | NR |
Troy Cobbley
|
|
|
###-#### Building not ready for life/safety final 10/24/2001 2:09:58 PM
|
BLD-Framing/Rough-in | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PASS |
Russ Owen
|
|
|
###-#### FRANK. subject to ele re-insp. 9/25/2001 11:34:03 AM
|
BLD-Concrete | 8/30/2001 | 8/31/2001 | 8/31/2001 | P | PART |
Russ Owen
|
|
|
terry -###-####- concrete 2nd lift of block at non structural in-fill has been poured appears ok all cells grouted. 8/31/2001 4:08:48 PM
|
BLD-Framing/Rough-in | 8/29/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Russ Owen
|
|
|
frank ###-#### block insp
|
BLD-Foundation | 8/23/2001 | 8/23/2001 | 8/23/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 8/23/2001 5:07:34 PM Inspected garge foundation wall on 8/22/01, and approved pour, I was called by contractor today to check top of wall cap which indicates 2 rebar and 8 in thickness now 3-1/2 and 1 bar ,note 2 bars were put into wall and only req 1, wall was poured taller, verbal c/n to verify this is acceptable with engineer , note this area is only at the entrance of existing garge. 8/23/2001 5:15:51 PM
|
BLD-Footing | 8/21/2001 | 8/22/2001 | 8/22/2001 | A | PASS |
Russ Owen
|
|
|
###-#### frank.existing shop. 8/22/2001 11:19:47 AM
|