Code Occupancy Approval | | | 7/22/2004 | | PASS |
|
|
|
LANDSCAPE AND FENCE AS REQUIRED FINAL SIGNED AND RELEASE OF BOND.
|
BLD-Final | 7/7/2003 | 7/8/2003 | 7/8/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/7/2003 at 4:13:54 PM. Contact: ###-####.
|
BLD-Final | 6/4/2003 | 6/5/2003 | 6/5/2003 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### rob needs all finals ect......
6/5/2003 10:59:52 AM
|
BLD-Framing/Rough-in | 3/3/2003 | 3/3/2003 | 3/3/2003 | P | PASS |
Tom Arcoraci
|
|
|
###-#### rob
|
BLD-Framing/Rough-in | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PART |
Russ Owen
|
|
|
###-#### . the draft stop needs to sealed at large areas. and center wall is bearing and needs blocking as writen. posted c/n insulation is not complete. 2/24/2003 3:02:28 PM
|
BLD-Framing/Rough-in | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PART |
Steven Webb
|
|
|
jim call 1st before insp--###-####-re-insp C/N posted--ok to insulate. 2/7/2003 2:27:19 PM
|
BLD-Framing/Rough-in | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | FAIL |
Tom Arcoraci
|
|
|
robert ###-#### CN POSTED DRAFT STOP HEADERS ECT... 1/21/2003 1:49:09 PM
|
BLD-Foundation | 9/18/2002 | 9/19/2002 | 9/19/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok per bob a and tom a 9/19/2002 10:04:20 AM
|
BLD-Final | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | FAIL |
Russ Owen
|
|
|
###-####. The first stop work order placed in may is still posted, and it does not appear that any more work has been done. 7/31/2001 10:59:24 AM
|