Permit Information
Permit NumberBLD01-00739
StatusFinaled
Name PETERSON L MARVIN & JEAN
Site Address 9101 W FAIRVIEW AVE
Project NamePETERSON MOTORS
Customer Number 
ePlanReviewNo
Description
PETERSON MOTORS ADDITION - TO CONSTRUCT A NEW 2,800 SQ. FT., ONE STORY, SHOWROOM/SALES AREA ADDITION TO THE EAST END OF THE EXISTING PETERSON MOTORS AUTOMOBILE SALES AND SERVICE BUILDING. THIS BUILDING ADDITION IS CONSTRUCTED OF CONCRETE SLAB FLOORS, MASONRY EXTERIOR WALLS, STEEL STRUCTURAL FRAME AND METAL ROOF WITH SINGLE PLY ROOFING SYSTEM. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR AREA INCREASE. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH 01-00043/PC0253-01/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/17/200110/17/200110/17/2001PPASS
DetailsRuss Owen
Scheduled by Inspector: 407 On 10/17/2001 4:06:00 PM . Ok for permanent oc. 10/17/2001 4:08:54 PM
Permanent Occupancy 10/17/200110/17/2001 DONE
Details
BLD-Conference9/24/20019/24/20019/24/2001PPART
DetailsRuss Owen
CONF ONLY DAN - ###-####, went over items needed with contractor for permanent occupancy. 9/24/2001 1:48:44 PM
BLD-Final9/19/20019/19/20019/19/2001PFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 9/19/2001 2:04:01 PM c/n posted . 9/19/2001 3:35:58 PM
BLD-Final9/13/20019/17/20019/17/2001ANR
DetailsRuss Owen
###-#### KAREN SMITH. will recall no paper work at the site. 9/17/2001 1:15:19 PM
BLD-Final9/13/20019/14/20019/14/2001ACANC
DetailsRuss Owen
###-#### CANCELED BY KAREN SMITH 9-13-01
BLD-Final9/10/20019/13/20019/13/2001ACANC
DetailsRuss Owen
###-#### FN DAN CANCELED BY KAREN SMITH/////DLD 9-13-01
BLD-Final9/6/20019/11/20019/11/2001ACANC
DetailsRuss Owen
###-#### Karen--- CANCEL PER DAN LYDA
BLD-Final8/30/20018/31/20018/31/2001AFAIL
DetailsRuss Owen
###-####.needs fire/life safety signed for a temp, other required signatures have been signed, also i have c/n posted fory 8/31/2001 11:35:20 AMexterior hc ramp hand rails to be installed ,and other items a noted on posted c/n at the site. NOT approved for occupancy at this time. 8/31/2001 11:36:24 AM
BLD-Final8/31/20018/31/20018/31/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/31/2001 2:54:13 PM ok temp oc c/n posted with contractor. 8/31/2001 4:10:16 PM
FIRE-Final Inspection8/31/20018/31/20018/31/2001PPASS
DetailsRick Jackson
###-####
FIRE-Final Inspection8/28/20018/29/20018/29/2001ANR
DetailsJoe Tawney
Final Not ready. Work not completed 8/29/2001 10:58:06 AM
BLD-Framing/Rough-in8/22/20018/22/20018/22/2001PPART
DetailsRuss Owen
ceiling inspection Dan ###-####, needs 6 lights tied at north side. 8/22/2001 3:34:47 PM
BLD-Framing/Rough-in8/3/20018/6/20018/6/2001APART
DetailsRuss Owen
###-#### steel stud.ok to cover. 8/6/2001 2:51:35 PM
BLD-Framing/Rough-in8/3/20018/6/20018/6/2001APART
DetailsRuss Owen
###-#### steel stud.ok to cover. 8/6/2001 2:51:35 PM
BLD-Conference7/30/20017/30/20017/30/2001PFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 7/30/2001 11:55:14 AM .went by job to check status/ soffit c/n. 7/30/2001 1:02:25 PM