BLD-Final | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 1/11/2002 3:07:56 PM ok for perm
|
BLD-Framing/Rough-in | 1/9/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
FIRE-Final Inspection | 1/9/2002 | 1/11/2002 | 1/11/2002 | A | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled OK for perm occ. 1/11/2002 10:13:26 AM
|
Permanent Occupancy | | 1/11/2002 | 1/11/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### cn posted 12/11/2001 2:01:59 PM
|
FIRE-Final Inspection | 12/7/2001 | 12/10/2001 | 12/10/2001 | P | FAIL |
Troy Cobbley
|
|
|
provide approved egress (landings and ramps) at exits and provide electrical corrections per Boise Fire Dept. at the LP tank 12/10/2001 4:15:04 PM
|
FIRE-Final Inspection | 11/28/2001 | 11/29/2001 | 11/29/2001 | A | FAIL |
Troy Cobbley
|
|
|
verify main retail entrance landing slope is OK, relocate exit sign in conference room, repair exit signs, provide fire extinguishers at LP and Fuel Oil tanks, verify no duct detectors are needed 11/29/2001 4:30:51 PM
|
BLD-Final | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | NR |
Russ Owen
|
|
|
doug ###-####needs fire/life safety 11/28/2001 3:48:05 PM
|
BLD-Final | 10/1/2001 | 10/2/2001 | 10/2/2001 | A | NR |
Tom Arcoraci
|
|
|
fn doug- ###-####
|
BLD-Framing/Rough-in | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to cover new 1-hour wall verify other 1-hour wall at next insp 9/20/2001 10:31:16 AM
|